Highway Maintenance and Integrated Management Systems
Maintenance management systems were among the first applications of rational management principles and the (then) the new technology of computers to highway operations. Recent changes...

An Integrated Design/Construction Research Program for Infrastructure Rehabilitation
The quality of America's infrastructure today is barely adequate to fulfill current requirements, and sufficient to meet the demands of future economic growth and development. This serious...

Evaluation of Two Automated Thresholding Techniques for Pavement Images
Thresholding of pavement images is an important step towards the design of an automated pavement crack detection system. However, traditional automated thresholding techniques generally...

Reliability Assessment of Concrete Pavement Sawing
Traditional concrete pavement design sometimes realize on qualitative decision based on experience, with concrete pavement sawing operations representing a specific case in point. presently,...

Treating Uncertainty in the Design of Horizontal Curves
A model based on expected total cost minimization approach is developed for determining optimal horizontal curvature for highway sections. Expected total cost is defined as the sum of...

Aesthetics in High Speed Rail Projects
Aesthetics is critical to the public acceptance and quality of the experience of a high-speed rail system. Social, functional, visual, kinetic, and symbolic aesthetics have specific design...

Automation for Design of High Speed Rail Alignments
The widespread industry practice of using civil engineering software modified for the design of High Speed Rail alignment is inefficient and produces inadequate results. Advances in computer...

High Speed Rail Loading Scenario and Dynamic Tuning of Track
Similarities and differences exist between conventional and high speed rail (HSR) infrastructure design. The differences stem from the dynamic nature of the HSR loading scenario and the...

Aerodynamic Resistance of Trains Running Through a Tunnel
In what follows, some previously published results and formulae have been combined in order to obtain an applicable tool for evaluating the energy consumption of trains in tunnel as a...

Dynamic Study on New Guideway Structure for JR Maglev
This paper presents an introduction of the study for the design and technical development of a newly proposed guideway structure for the superconductive magnetically levitated train system...

Implementation and Maintenance of a TGV Line
Because of the success of the TGV in France since the opening date in 1981, SNCF plans to implement 2800 miles of new line in the next 20 years. A new line project poses two management...

The Singularity of Spanish Railway High Speed
The Madrid-Seville line has been the main target in many action programmes pursuing the improvement of its insufficient capacity. In 1987, the Government proposed a high speed line (250...

Hydraulic Design of Reversible Flow Trashracks
This monograph, Hydraulic Design of Reversible Flow Trashracks, consolidates the body of information on reversible flow trashracks into a design...

Structural Engineering in Natural Hazards Mitigation
This two-volume set of proceedings, Structural Engineering in Natural Hazards Mitigation, contains the papers presented at Structures Congress...

Small-Government GIS
Geographic information systems, or GISs, have shown great potential for use as a tool by public engineers working on the state and municipal level, but the time and money required to put...

Runway Rehab: A Case for CADD
Hired to design and monitor construction at Boston's Logan Airport, engineers at S E A Consultant's quickly realized that they would have to supplement their...

Lifelike Model
Data from about 400 structures in the San Francisco Bay Area were recorded during the 7.1 Richter-scale Loma Prieta quake. Among these structures was a 49-story office tower in downtown...

Landfill on Screen
Engineers for a $3.7 million regional landfill in Iowa turned to computer-aided design at every project step from conceptual design through operations monitoring following construction....

Colorado Dome
Innovative engineering and precise design helped engineers overcome a building's unique shape and difficult site to deliver the $71.5 million Jefferson County Government Center...

Vertical Erosion on Beaches and the National Flood Insurance Program
During the 25 years that the National Flood Insurance Program (NFIP) has been in existence, there has been an increasing recognition of the contribution of both episodic and long-term...

 

 

 

 

Return to search