Hydraulic Design Aspects of the Boston Outfall
The diffuser outfall under design for Boston must have the ability to be purged of seawater upon commissioning or following an accidental flow stoppage. The criteria governing the flushing...

A Rational Approach to Selecting an Optimal Design Storm for Flood Control
A rational methodology is presented herein for determining the optimal design storm frequency when planning for flood protection in new urban areas. The technique was developed from an...

Design and Performance of Diversion Gates at Peace Canyon Dam
During construction of Peace Canyon Dam, river diversion was accomplished using a combination of cofferdams and temporary diversion conduits through the partially completed dam. Inlet...

Physical Modeling of Major Cutoffs
In 1987, a model study of Lock and Dam No.4 on the Red River in Louisiana required two major cutoffs and a lock and dam to be modeled. Although the Waterways Experiment Station has modeled...

Probabilistic Approaches to Maintenance
All structures and their components are subject to the aging process, to wear and tear in the performance of assigned functions and to deterioration by exposure to the operating environment....

Fixed-Wheel Gates Uses and Limitations
The fixed-wheel type of gate, which derives its name from sets of wheels mounted on axles fixed to the gate, rolls upon and transmits the hydraulic load of the gate to guide tracks bearing...

Elements of a Coastal Stormwater Drainage System
Several elements in the design of a stormwater drainage system that outfalls to the ocean are discussed. The paper discusses a study conducted of the Ocean Lakes Watershed near Myrtle...

Model for Determining the Optimal Rehabilitation and Replacement of Water Distribution System Pipes
K.E. Lansey and L.W. Mays developed a new methodology for the minimum cost design of new and expansion of existing water distribution systems. This methodology interfaces a nonlinear programming...

Trashrack Cleaning?A Job Requiring Utmost Care
During the last few years, the tendency in most industries has been towards more automation. Hydro has been no exception. Trashrack raking machines have followed this trend, and automatic...

Design Considerations for a Penstock Located in an Outlet Tunnel at the Jennings Randolph Dam in West Virginia
The proposed production of hydropower at this flood control-recreation dam involves the installation of a 78 inch diameter steel penstock at the crown of the existing tunnel. The penstock...

Dam Rehabilitation and Fish Lift Design at the Pejepscot Hydroelectric Project
The rehabilitation work on the existing rockfilled timber crib dam comprised an assessment of the existing dam stability; analysis of the existing hydraulic conditions to establish the...

A Comparative Hydraulic Model Study of an Orifice Spillway
The results of a hydraulic model study to investigate the feasibility of using an orifice spillway at a generating station in northern Manitoba, Canada are presented. It has been suggested...

J. C. Boyle Hydroelectric Project Spillway Model Study
The J.C. Boyle Hydroelectric Project is an 80 MW facility near Klamath Falls, Oregon. The project consists of a concrete canal, tunnel, parallel penstocks and two Francis turbines. Upstream...

Flow Characteristics in an Irregular Spillway Model
A physical model of the spillway for a proposed water supply reservoir near Meridian, Texas, was constructed to determine the optimum spillway design which would maintain an acceptable...

Freeboard Allowances for Chute Spillways
Allowances must be made for the physical phenomena which cannot be modelled, such as wave action, air bulking, splash and spray; the simplifications of behaviour implicit in the calculations;...

Modeling a Small Side Channel Spillway-Model Testing Need Not Be Expensive or Time-Consuming
Effective hydraulic modeling can often be done without sophisticated laboratory equipment and instrumentation, yet provide adequate design information in less time and at less cost than...

Hydraulic Model Studies - Sidney A. Murray Jr., Hydroelectric Plant
The power plant is located at the Old River Control of the Lower Mississippi River (Louisiana). It consists of an intake channel about 5000 ft long, a power plant with eight bulb units...

A Design Parameter Study of Turbine Draft Tube by Viscous Flow Analysis
Viscous flow analysis based on the full Reynolds-averaged Navier-Stokes equations is being applied to predict successfully turbulent flow characteristics and energy losses in different...

Moose River Air Chamber Design and Performance
The Moose River Hydroelectric Project is a 12.5 MW development located in upstate New York. It employs an underground air chamber to protect the unit and power tunnel from pressure surges...

Hydraulic Model Tests of Flow around Penstock Suspended inside the Tunnel for Design of a Small Hydro
The proposed hydropower project in the State of Virginia involves design and construction of a steel penstock hung from the crown of an existing outlet tunnel at this U.S. Army Corps of...

 

 

 

 