Safety of Dams Activities in the Bureau of Reclamation Lower Colorado Region
In the Lower Colorado Region of the Bureau of Reclamation (BuRec), there are presently eight BuRec dams and one Bureau of Indian Affairs dam being modified or studied for modification...
Conversion Experience at the Chief Joseph Dam Project
In August, 1983, Woodward Governor Company was awarded U. S. Army Corps of Engineers contract DACW67-83-C-0076 to convert ten existing Allis-Chalmers and six existing Woodward Governor...
Renovation of the Shoshone Powerplant, Wyoming
Shoshone Powerplant and Buffalo Bill Dam are located on the Shoshone River approximately 5 miles (8. 1 km) west of Cody, Wyoming. The Powerplant was completed and the first two generating...
Rehabilitation of Victoria Dam
Rehabilitation of a 54-year old thin concrete arch-buttress dam was completed without interruption of power generation using pressure injection of an epoxy adhesive. This paper presents...
Resolving Environmental Conflicts During Licensing?A Case History
Vischer Ferry and Crescent Dams are located on the lower Mohawk River near Albany, NY. In September 1982, the Power Authority of the State of New York filed license applications with the...
Gas Bubble Disease in Trout Below a Low Dam
Research and efforts to reduce nitrogen supersaturation which is affecting trout in the Bighorn River, Montana, below Yellowtail Afterbay Dam is described. Nitrogen supersaturation can...
Fish Studies for a Small Hydroplant in Michigan
The Morrow Lake hydroelectric project is a new facility which is scheduled to become operational in August 1985. A study has been developed consisting of two main parts: Potential change...
Assessment of Probable Fishery Impacts of Hydroelectric Development at Lock and Dam No. 26 (Replacement), Mississippi River
Early coordination with affected Federal and state agencies allowed completion of an Environmental Assessment for a hydroelectric plant proposed for Lock and Dam No. 26 (Replacement)....
Independent Review of Truman Dam Operation
The Truman Dam in Missouri was constructed by the Army Corps of Engineers in 1979 as a pumped-storage facility. Due to fishkill and other controversies, the pumpback feature of the project...
Hydroelectric Project Design Using Microcomputers
The main issue in the first stage of a hydroelectric project is to assess the influence of hydrologic parameters on design and optimum sizing of the installation and on future energy production....
Riverbank Stability and Monitoring at Grand Coulee Dam
The capability for hydroelectric power generation at Grand Coulee Dam was substantially increased following construction of the third powerplant in the mid 1970s. Increased river fluctuations...
New Runners for Aswan High Dam Power Station
Replacing turbine runners at Egypt's Aswan High Dam Power Station is a major project because of the size, quantity and importance of these turbines to the Egyptian economy....
Design of Drilled Piers Subjected to High Overturning Moments
The results are presented of a research study directed at improving the state-of-practice, and resulting foundation economy, in the design of laterally loaded drilled pier foundations...
IEEE/ASCE TransmissionStructure Foundation Design Guide
The American Society of Civil Engineers' (ASCE) Subcommittee on Foundation Design for High-Voltage Transmission Structures was formed in October 1976. The purpose of the Subcommittee...
Special Pile Foundations for a Coastal Permafrost Site
The design of the plant's foundations had to address several challenging geotechnical conditions. These included (1) 'warm' (close to 32 degree F)...
Building Foundation on Thawed Soil and Permafrost
The site of a planned 10,000 square foot State Youth Facility in Bethel, Alaska was found to be underlain by discontinuous permafrost. This paper describes the geophysical and geotechnical...
35-Year-Old Foundations, Thule Air Base, Greenland
In February 1951 the secret project 'Blue Jay' to construct the base began. Timber piling were used in the foundations of boilers, generators, and other heavy...
Design and Monitoring of an Ice Drill Pad
An ice pad was sucessfully designed and built to provide a suitable foundation for an exploratory drill rig in the National Petroleum Reserve of Alaska in early 1985. Design considerations...
A Self-Refrigerated Gravel Pad Foundation for Large Thermal Loads
Design criteria for a proposed power plant at Thule Air Force Base, Greenland, involved both large thermal loads from the diesel engines and large static loads from an eight foot thick...
An Economical Approach to Receiving Coal by Rail in the Sub-Arctic Environment
During the period 1983 to early 1985 a multimillion dollar coal transfer facility was designed and constructed in Seward, Alaska. The facility transfers coal from rail cars to temporary...