Building Arrangement and Site Layout Design Guides for On Site Low Level Radioactive Waste Storage Facilities
This paper will discuss a typical storage facility and address the design considerations and operational aspects that are generally overlooked when designing and siting a low level radioactive...

The Origin, Training, Evaluation and Status of Construction Inspectors
Inspection of construction is mandated by law. Design engineers cannot disclaim their responsibility for construction inspection by citing self-serving language in the contract documents....

Requirements of a High Technology Owner
The requirements of a high technology owner are best represented by a set of expectations and goals that are needed to achieve a certain business plan. There are extreme time pressures...

Structural Engineering for High Technology Clients
The unique requirements of the high tech industry provide interesting and fascinating challenges to the structural engineer of the 1980's. The following is a list of the most...

Design of High-Technology Facilities from the Vibration Standpoint
High-technology facilities, such as those used for the production of integrated circuits or for optics research, generally require extremely limited vibration environments. Suitable precautions...

Renovation Versus New Construction for High Technology Manufacturing Facilities
The purpose of this paper is to compare the differences between renovation and new construction for High Technology Manufacturing Facilities. The standards of quality, cost, and schedule...

Facility Location and Land Use: The Urban/Rural Dilemma?A Commentary
A large part of the dilemma associated with the conflicting impacts of facility location and land use is not so much a lack of technical engineering input, but rather the lack of analytical...

Designing People Places
Designing people places on the waterfront relies on first satisfying people's needs. The needs of people in public places (both on and off the waterfront) include at least...

The Changing Configuration of Commercial Ports
The ports of the world are constantly changing. The present day concept of a ship or barge entering a harbor, being unloaded, reloaded and 'sailing' out is not...

Complexity in Concrete
Centrust Tower in Miami, Fla., is a $95 million, 37 story, 600,000 sq ft tower rising from one side of a block-square 11 story parking garage. Columns on the curved side of the triangular...

Nuclear Waste Handling and Storage
These papers examine a number of topics related to handling and storage of nuclear wastes and spent fuel as well as some topics related to transportation and long term disposal of nuclear...

Facility Location and Land Use
The Urban/Rural Dilemma
Most land use planning techniques focus on large metropolitan areas, with relatively little attention paid to smaller communities. Recent issues such as nuclear power plant location, water...

Parking Efficiency Through Shared Parking Concepts
Due to continuing demand for concentrated parking supply in our urban areas, developers and public agencies must devote a significant amount of their resources and energies to providing...

Defining the Infrastructure Problem?The Local View
The Governor's report defines infrastructure as 'the collective network of physical facilities and their maintenance necessary to sustain economic growth and...

Construction of Strontia Springs Dam
Strontia Springs Dam is a principal feature of the Foothills Project on the South Platte River, 25 miles southwest of Denver, Colorado. The dam provides for storage and diversion of water...

Deep Water Bering Sea Development Concepts
A brief description of the major environmental factors that a structure used to produce oil and gas in the deep water Bering Sea would have to cope with is presented. In particular, the...

Ice Forces on Port Structures Resulting from Moving Ships
Results are described of experiments carried out in Thunder Bay Harbour in March, 1984, to measure ice forces on a port structure. Ice forces were measured by installing five pressure...

Structural Considerations for a Radwaste Facility
The structural engineer needs to consider several criteria when designing a radioactive-waste processing facility in order to properly balance the requirements of safety and economy. This...

Nuclear Power Plant Delays: Probable Causes and Resolutions
The nuclear power industry in the United States is experiencing technological as well as construction and operation problems in nuclear facilities. It is the intent of this paper to review...

Civil Engineering Challenge with Nuclear Waste
The planning, design and construction of the ground surface facilities for a nuclear waste repository involves civil engineering in many ways. The transportation of heavy, metal shielded...

 

 

 

 

Return to search