Evaluation of Embankment Erosion at TVA's Chickamauga Project
Studies were made to evaluate the extent of erosion to be expected under probable maximum flood (PMF) conditions. The erosion studies were made using the EMBANK computer program. The results...

Overview of Autoventing Turbine Technology Development Project
Low concentrations of dissolved oxygen (DO) in the discharge of hydro plants represent one of the most significant environmental concerns confronting the hydropower industry. This is especially...

Experimental Difficulties Encountered in Testing Air/Water Mixtures
The Tennessee Valley Authority and Voith Hydro, Inc., are conducting a joint research project to study the effects of air admission on hydraulic turbines. Francis turbine models, homologous...

Application of Appropriate Technology in Hydroelectric Project Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. A primary concern is spillway and stability inadequacies resulting...

Appropriate Technology in Infrastructure Development and Management
Infrastructure management principles apply to appropriate technologies used for hydraulic structures. However, some of the principles are more culturally sensitive than others, mainly...

A Review of Modeling and Analysis Approaches for Optimization of Reservoir System Operations
Numerous mathematical models have been developed for sizing reservoir storage capacities and establishing operating policies during project planning, for reevaluating the operating policies...

Seawater Delivery for Use in Aquaculture Development
Seawater is used extensively in industrial and aquacultural developments world wide, and aquaculture in particular requires large quantities of seawater. Development and design of facilities...

Numerical Modeling of Proposed Channel Designs (J. F. Baldwin III), California
Ship simulator studies of proposed improvements to navigable waterways are a very important part of any assessment. The John F. Baldwin Channel (JFB) Project (Phase III) is a ship channel...

Planning and Organization to Control Liabilities and Insurance Cost
The liabilities and insurance cost associated with construction projects can be considerable. Activities that are performed which carry extensive liability exposures with limited controls...

Modular-Prestressed Shoring System for Demolition
Two case histories are used to present the development and performance of a modular prestressed vertical shoring system to control deflections of existing structures during the demolition...

Who Pays for the Unexpected in Construction?An Architect's Viewpoint
As an Architect, who in the first instance is contractually obligated to address the full range of design discipline services, the question of 'who pays for the unexpected...

Laboratory and Field Research in Construction Automation
This paper presents a series of research projects to build and test prototype systems. It has been found that prototyping provides an economical approach to support both basic and applied...

Computer Assisted Design and Construction
This paper presents a comprehensive package for conducting structural analysis, design, and project management on microcomputers. Several examples are presented to illustrate the usefulness...

Graphical Database for Construction Planning and Cost Control
Stone & Webster Engineering Corporation is using Computer Aided Construction (CAC) System that integrated construction planning with estimate development, schedule generation,...

Project Management in Areas of Socio-Political Conflict
Project managers routinely deal with project locations which provide adverse environmental conditions. A location in which social and political conflict exists may prove to be extremely...

The Role of Scheduling in Computer Integrated Construction
Engineering and construction firms are showing a growing interest in computer integrated construction because they recognize the increased productivity and quality that can be obtained...

Project Controls for Denver International Airport
Managing a $2 billion dollar construction program requires a unique application of tried and true control systems and provides an opportunity to innovate new methods. The Program utilizes...

Project Controls on the Channel Tunnel Project
Establishing controls for a multi-facted, multi-billion dollar, privately financed, project which is run by two organisations created solely for that one project has been a major challenge....

Design of Large Project Permit Management System
This paper provides a brief overview of the functional specifications for a Permit Tracking and Evaluation System (PTES) which is interfaced to the master schedule of design and construction...

Design and Construction Integration Using Object Oriented Project Model with Multiple-Views
Generating, sharing and maintaining project data among multiple disciplines and throughout a project life cycle is difficult task in the highly fragmented A/E/C industry. Presently, the...

 

 

 

 

Return to search