Dam Stabilization/Modification at Lighthouse Hill and Schuylerville Hydropower Developments
Remedial measures including posttensioning of concrete structures, earth dike armoring, tainter gate modification and replacement of deteriorated concrete to meet federal and state hydraulic...
Bishop Intake #2 Spillway Modifications: A Case History
This paper covers the history of the events leading to the modification of Southern California Edison's (SCE) Bishop Intake 2 to pass a site specific design flood. From the...
Brule Hydroelectric Project Inflow Design Flood Study
In 1987, Wisconsin Electric Power Company (WE) was directed by FERC to provide additional spillway capacity at it's 63-foot (19 m) high Brule Dam. Original spillway capacity...
Diversion of the Parana River for the Yacyreta Hydroelectric Project
The diversion and closure of one of the world's largest rivers, the Parana River on the border of Paraguay and Argentina, for the 2760 MW Yacyreta Hydroelectric Project, sponsored...
Prefabricated Power Plants, Experience and Prospects
This paper presents the prefabrication concept applied to the Greenup (Greenup Locks and Dam, Ohio River, 72 MW, 1982) and the Sydney A. Murray, Jr. (Old River Control Structures, Vidalia,...
Rocky Mountain Project?Overview
The Rocky Mountain Project, in Northwest Georgia, will be a three unit hydroelectric pumped-storage project with 850,000 kW installed in an above ground powerhouse. The gross water volumes...
Hydraulic Model Studies?Pak Mun Hydroelectric Project (Thailand)
The paper presents briefly the hydraulic problems related to the project which were successfully solved by the 1 to 100 scale hydraulic model study carried out at the Asian Institute of...
Physical Hydraulic Modeling for Construction of New York State Dam Hydroelectric Project
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into four main channels as the water...
Pressure Control Studies for PG&E's 20 MW Grizzly Hydroelectric Project
The Pacific Gas and Electric Company's Grizzly Hydroelectric Project consists of a single 20 MW Francis turbine under 700 feet head located near the existing Bucks Creek Project....
Manufacturing Planning 4 ? 440 MW Turbines Short Delivery
DBS Escher Wyss Inc. is building the largest turbines ever to be manufactured in Canada for the third expansion of the Tarbela project in Pakistan; four (4) Francis turbines each rated...
A Case Study, Large Versus Small
This paper will review the hydraulic comparisons between the Lock and Dam No. 13 Hydropower Project, a 33-MW, low-head generating station near Fort Smith, Arkansas, and the Murray Hydroelectric...
Sidney A. Murray, Jr. Hydroelectric Power Plant Turbine Hydraulic Design and Testing
This paper describes the project design concept, highlighting the choice of turbine type and capacity. Model testing and analysis of control by downstream gate is an important feature...
Operations and Maintenance Manual for Bradley Lake Hydroelectric Project
Bradley Lake Hydroelectric Project is located on the Kenai Peninsula of Alaska. The project consists of two 63 MVA turbine-generators fed via a single 3.5-mile-long penstock. The water...
The Zebra Mussel Invasion Niagara Power Project
The zebra mussel is a prolific mollusk that has recently invaded the Great Lakes region. It has a proven track record for causing severe macrofouling at power utilities and water municipalities....
Robert Moses Procurement and Model Tests ? A Contractor's Perspective
This paper discusses (1) the need to provide realistic cost/benefit evaluation criteria in turbine bid specifications and (2) the benefits of competitive model testing. Recent procurement...
Ashton Hydroelectric Project Rehabilitation
This paper presents the project experience of rehabilitating the 70-year old Ashton power house and performing the dam design modifications to pass the increased probable maximum flood....
Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...
Development of an Eicher Screen at the Elwha Dam Hydroelectric Project
The Eicher Screen is a relatively new concept for screening juvenile fish out of hydroelectric turbine penstocks. The concept was developed by Mr. George Eicher and one was recently installed...
Design Concepts for Vertical Kaplan Turbines
In this paper, some general aspects as well as selected design details of vertical Kaplan turbines are presented. The Monroe Street project which is under construction right now serves...
Description and Evaluation of Program: SNUSM
The Staggered Net Unsteady State Model (SNUSM) was developed in the early 1980's by the United States Bureau of Reclamation under the direction of Bob Gooch and Al Graves....
Return to search