The Construction of New Victoria Dam, Australia
The paper discusses various aspects of the construction of the New Victoria Dam, a 52 m high, high-paste content RCC dam constructed near Perth, Western Australia. The mix design and its...

Roller Compacted Concrete Arch/Gravity Dams?South African Experience
The paper traces the development of roller compacted concrete (RCC) dams in South Africa, and in particular the application to arch/gravity dams. The Department of Water Affairs and Forestry...

The Design and Construction of Shuikou Project RCC Diversion Wall
Shuikou Hydroelectric Project, currently under construction on the Minjiang River in the People's Republic of China is a concrete gravity dam having a maximum height of 101...

A Review of Design Criteria for High RCC Dams
The 1980s could be considered to be the decade during which roller-compacted concrete dams came of age. This economic method of construction is sufficiently proven that very large dams...

Performance of Upper Stillwater Dam
Upper Stillwater Dam was constructed with roller compacted concrete (RCC) and horizontally slipformed facing. This unique construction method for a concrete gravity dam included no contraction...

Lessons Learned from Elk Creek Dam
This is the third of a series of papers published on the design and construction of Elk Creek Dam. The first paper discussed design and construction concepts to provide water tightness...

RCC Dam Construction?A Contractor's View
A contractor's view of RCC dam construction is presented. It begins with the principal construction elements and the challenge created by their interrelationships. Men and...

Economic Factors in Roller Compacted Concrete Dam Construction
This paper deals with some of the economic factors that designers and contractors need to consider in the design and execution of an RCC dam. Costs for the RCC portion of the Upper Stillwater...

Mixing and Delivery of Roller Compacted Concrete
Mixing and delivery of RCC are discussed. Both the design aspects such as variability and joint quality, and the construction aspects such as equipment capability and performance are covered....

Construction of Urugua-I RCC Dam
Considerations concerning the RCC construction process and its relation with the design and quality are analyzed. The paper contains topics related to the experience obtained at Urugua-i...

RCC Dam Design Concepts Versus Construction Conditions for Stagecoach Dam
The Stagecoach RCC dam was constructed using current state-of-the-art knowledge and the geotechnical approach to roller compacted concrete (RCC) mix design. The design was prepared in...

RCC Mixes and Properties Using Poor Quality Materials?Concepcion Dam
This paper discusses aggregate studies, mix investigations, and material property tests for the relatively poor quality materials available for use in RCC at Concepcion Dam....

Thermal-Structural Analysis Methods for RCC Dams
Current procedures for evaluating temperature control and the placement of contraction joints in roller compacted concrete dams are not always evaluated with the aid of detailed analysis...

Final Design and Construction of Gibraltar Dam Strengthening
The results of a 1983 safety evaluation of Gibraltar Dam indicated that the dam did not meet seismic safety standards. A remedial scheme involving the addition of a roller compacted concrete...

Santa Cruz Dam Modification
Santa Cruz Dam was the first concrete arch dam in the United States to be modified using an roller compacted concrete (RCC) buttress. Innovative techniques included forming the stepped...

Roller Compacted Concrete III
This proceedings, Roller Compacted Concrete III, includes papers presented at the ASCE Specialty Conference held in San Diego, California on...

The Heartbeat of the Artery
One of the most ambitious infrastructure megaprojects in recent memory, Boston's $5 billion Central Artery runs the gamut of civil engineering disciplines. Design, highway,...

Staffing Up for a Major Program
A nine-member construction management section must pilot a $335 million, multi-project capital improvement program over the next five years. Should construction management duties automatically...

An Overview of Segmented Offshore/Headland Breakwater Projects Constructed by the Buffalo District
Since 1977 the Buffalo District has constructed three segmented offshore breakwater projects and currently has one under construction. In addition, the District has recently completed...

Bay Ridge, Anne Arundel County, Maryland Offshore Breakwater and Beach Fill Design
Construction of the Bay Ridge shoreline protection project was completed in July 1991 and consists of eleven offshore segmented breakwaters with beach fill. The breakwaters, located about...

 

 

 

 

Return to search