Reliability of a Suspension Bridge Under Traffic Flow
The problem of reliability of a single-span spatial suspension bridge under random highway traffic is considered. The displacements of the bridge are described by coupled, non-linear,...
Research on Structural System Reliability of Cable-Stayed P.C. Railway Bridge Across Hong-Shui River
This paper analyses the structural system reliability of cable-stayed bridge by using the modified all failure modes. The concept of the structural subsystem is used to help the selection...
Vibration Tests and Damage Detection of P/C Bridges
A three-span countryside P/C bridge has been found to have excessive deflections in two of the three spans. It is reported that the prestresses in tendons of two girders of different spans...
The NOVA SPAN Bridge System
The NOVA SPAN Bridge concept provides the basis for the design and construction of a new variant in the field of bridges and culverts which, in its performance and operation, incorporates...
Buried Structural Capacity of Insituform?
In July 1988, a test was conducted at Utah State University to determine the structural support that can be provided to a failing rigid pipe system through the use of the Insituform process....
Whatever Happened to Long-Term Bridge Design?
The Chairman of the Board of one of the leading engineering firms in the nation ponders the future of American bridges. In today's designing of bridges, Thomas R. Kuesel points...
Seam Examination
Charron discusses the importance of seam sampling in geomenbrane installation. In 1988, about 30 million mi of polyethylene geomembranes were used to line landfills, liquid impoundments,...
Creative Connections: Bridges as Art
Princeton University professor of civil engineering David P. Billington, at the invitation of civil engineering professors at Tokyo University, tours Japan and critiques several of the...
Dynamics of Composite Tubes
A displacement-based stiffness method is used to study the characteristics of dispersive wave propagation in laminated composite cylindrical tubes. It is assumed that the tube is composed...
Design Considerations for a Ceramic Fabric Radiator
The design of an Advanced Ceramic Fabric (ACF) thermal management device for use in both interplanetary and near-earth space must consider several important aspects of the environment....
A Knowledge-Based Approach to the Design of Highway Bridge Foundations
This paper discusses the development of a prototype expert system using a commercially available expert system shell. The system is to be used for the selection of highway bridge foundations....
A Bridge Management System Module for the Selection of Rehabilitation and Replacement Projects
A procedure, developed for the state of Texas is reported, which determines an allocation budget for bridge replacement and rehabilitation projects, using multi-attribute criteria and...
A Microcomputer Aided Bridge Management System
This paper presents a microcomputer based software system suitable for a local agency which will permit a local bridge system to be systematically evaluated with the use of a bridge management...
Florida Bridges Beat the Clock
Today, when budget overruns and delays on construction projects are the rule more than the exception, 11 precast segmental balanced cantilever bridges on two contracts were recently completed...
On the Drawing Board
Reliable and quantitative nondestructive evaluation (NDE) methods for construction materials of wood, concrete, masonry and structural steel are needed. NSF program director John Scalzi...
Bridges Under Surveillance
Although bridge monitoring is still in its infancy, research, pilot studies and field work are underway across the country. While today it's still a pie-in-the-sky goal, the...
Northumberland Strait Crossing Project?A Public-Private Venture
This major project has challenged the Canadian Government to produce innovative requirements in environmental planning, financing and security, and facility performance. It requires a...
Translating Bridge Tolls to a New Bridge: The Third Dartford River Crossing
In March 1986, the Department of Transport of the United Kingdom Government published Guidelines inviting promoters for the submission of private sector bids for the design, construction...
Hydraulic Bridge Design for Movable Bed Conditions
This paper addresses the practical considerations of hydraulic design of a bridge under movable bed conditions. Hydraulic design tasks include pier and abutment scour calculations, design...
Alignment of Large Flood-Peaks on Arid Watersheds
Bridge and culvert design requires estimates for 25- to 100-year return period flood peaks (Q). Floodplain delineation calls for 500-year (Q500) estimates. Arid western flood series are...