Education, Research and Training for Appropriate Technology
Much has been written about appropriate technology (AT) and how to accomplish it. This paper adds to that literature with specific ideas for education, training and research programs and...

Application of a Generalized Risk Dynamic Model to a Spillway Design Flood
Risk analysis can provide a logical basis for selecting the optimal design capacity of a flow conveyance hydraulic structure for the least total cost or specified non-exceeding risk levels....

Dam Removal Methods, Elwha River, Washington
Preparation of an Environmental Impact Statement (FERC, 1991) for licence applications for the Elwha and Glines Canyon hydroelectric projects on the Elwha River, Washington, included evaluation...

Data Acquisition Systems for IBM Compatible System
Portable data acquisition systems composed of IBM compatible PC/XT/AT computers and analog to digital conversion cards can be configured with relative ease. These systems have the flexibility...

Safety Analysis of Handset Wood Slab Formworks
A reliability index is calculated for flexural strength of a handset wood slab formwork system. Load and resistance models are based on a survey of construction loads and wood test data...

Limit States Design of Wooden Formwork for Concrete Walls
Load and resistance factors are developed for ultimate limit states design of wooden formwork components for concrete walls when the lateral concrete pressures are computed using the ACI...

A Design for Automated Pavement Crack Sealing
An automated crack sealing system can have substantial economic benefits including reduced labor costs, improved quality, and improved safety. While automating crack sealing is technically...

Construction and Robotics: Problems and Solutions
The role of robotics in construction, and the role played by construction engineers (CE's) is placed in perspective. Robot development, like machine manufacture, has always...

Automation of a Truck-Mounted Drill Rig
Truck-mounted drill rigs used for soils properties investigation, foundation evaluation, ore exploration, and producing monitor and water wells typically require, because of their weight,...

The CRANIUM: A Case Study of Sensory Improvement for Construction Equipment Operators
Machines excel at physical processes such as generating large forces and performing repetitive motions, but humans are still better at information intensive processes such as planning,...

Project Management in Areas of Socio-Political Conflict
Project managers routinely deal with project locations which provide adverse environmental conditions. A location in which social and political conflict exists may prove to be extremely...

Restructuring Responsibility and Reward for More Construction Innovation
This paper proposes modifications to the contractual systems customary in the U.S. construction industry with the objective of encouraging technology innovation. The relationships among...

Partnering: Contracting for Quality
The concept of partnering is an approach to conducting business that confronts the economic and technological challenges confronting the U.S. Construction Industry in the 1990's....

The Free Trade Agreement and Working on Each Other's Turf
The Free Trade Agreement between Canada and the United States is a catalyst for increased cross border construction work. The impact on the Canadian economy is considered. Somes negative...

Dealing with Construction People (The People Side of Construction Profits)
The people side of producing construction job profits is usually tied to quantitative measures of craft productivity, morale and quests for quality. At the same time that people usually...

Construction Communications?What the Contractor Has to Write: And How
Only zero defects in scheduling, cost control, and specification compliance can maximize construction business profits. You can never produce a perfect project, but by clear, uncomplicated,...

Elements of an Effective Inspection Program
Construction is an industry whose very success is highly dependent on the people involved. It follows then that a key element in any effective inspection program is the people who make...

Responsibility and Liability of Inspection
There is much confusion over who is responsible for inspection of construction. This paper argues that the designer is the most appropriate individual to inspect the work. The designer...

Kinematics and Trajectory Planning for Robotic Excavation
One of the high volume and repetitive construction operations at the construction site is the excavation of soil. Automation of the excavation work requires a robotic system that is able...

Biological and Physical Aspects of Dredging, Kings Bay, Georgia
This proceedings, Biological and Physical Aspects of Dredging in Kings Bay, Georgia, contains papers presented at Coastal Zone '91,...

 

 

 

 

Return to search