Overtopping Protection for A. R. Bowman Dam
Arthur R. Bowman Dam is a 245-foot-high (74.7-m) central-core rockfill dam located on the Crooked River in central Oregon. The probable maximum flood (PMF) would overtop the dam by 20...

Innovative Reregulation Weirs for Dam Releases
Two different reregulation weir designs for dam release improvement are discussed. A porous timber crib is favored for applications where increased minimum flow is needed, and a labyrinth...

Application of Appropriate Technology in Hydroelectric Project Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. A primary concern is spillway and stability inadequacies resulting...

Design of High Capacity Spillways for Ritschard Dam, Colorado
A hydraulic model investigation was conducted by the Bureau of Reclamation to assist in designing the hydraulic structures associated with Ritschard Dam. Ritschard Dam will have a labyrinth...

Dam Break Analysis for a Series of Dams Using the HEC-1 and DAMBRK Computer Programs
The HEC-1 and DAMBRK computer programs were developed by the US Army Corps of Engineers, Hydrologic Engineering Center (HEC) [3] and by the National Weather Service (NWS) [4], respectively....

Sedimentation Problems and Solutions: Roseires Dam and Reservoir, Sudan
Roseires Dam and reservoir are located in Sudan, Africa on the Blue Nile River. The hydropower from the reservoir provides approximately 80% of the power used in Sudan, thus having a tremendous...

Dam Removal Methods, Elwha River, Washington
Preparation of an Environmental Impact Statement (FERC, 1991) for licence applications for the Elwha and Glines Canyon hydroelectric projects on the Elwha River, Washington, included evaluation...

Sediment Modeling of Dam Removal Alternatives, Elwha River, Washington
The new version of the U.S. Army Corps of Engineers (ACOE) 1-Dimensional sediment transport model, HEC-6 'Scour and Deposition in Rivers and Reservoirs', was...

Sediment Problems Associated with Dam Removal, Muskegon River, Michigan
This paper presents an analysis of sediment movement in Michigan's Muskegon River following the removal of Newaygo Dam. The analysis utilized a physical process simulation...

Predicted Fluvial Response to Dam Removal in the Kalamazoo River Valley, Michigan
Research has been conducted by the Michigan Department of Natural Resources (MDNR) to predict the fluvial response to dam drawdown and determine the distribution of recent deposits along...

Computerized Hydraulic Modeling?A Case Study
A hydraulic model study is being conducted at the Alden Research Laboratory, Inc. (ARL), to study the effects of adding a hydroelectric generating station at the site of an existing lock...

Gropps Lake Dam
Gropps Lake Dam has a concrete ogee spillway with earthen abutments at either end of the spillway. The dam features an internal drainage system, outlet works, an energy dissipator, a steel...

On The Application of Artificial Viscosity in Computational Hydraulics
Artificial viscosity is a particular kind of truncation error that is either implicity present or explicitly added to the finite difference schemes. It is shown that the method of lines...

Safety Analysis of Handset Wood Slab Formworks
A reliability index is calculated for flexural strength of a handset wood slab formwork system. Load and resistance models are based on a survey of construction loads and wood test data...

Limit States Design of Wooden Formwork for Concrete Walls
Load and resistance factors are developed for ultimate limit states design of wooden formwork components for concrete walls when the lateral concrete pressures are computed using the ACI...

FHWA'S Bridge Temporary Works Research Program
The Federal Highway Administration (FHWA) has developed a research program to address bridge falsework design and construction. This resulted from the collapse of the Route 198 bridge...

Performance of a Prestressed Rigid Frame During Removal of Column 6W from I93 in Boston, Massachusetts
The first phase of the suppression of Boston's Central Artery included the Early Viaduct Construction in the Central Artery North Area. This project required that Column 6W...

Who Pays for the Unexpected in Construction
The problem of who pays for the unexpected in construction is discussed in relation to the testing and inspection of construction materials. Laboratory is often blamed for poor construction...

The Debate Over Large Dams
Dam megaprojects across the globe are under increasing scrutiny. Critics say large dams have clearly lost their luster. While the outcry over huge public subsidies and high ecological...

Ductile Frames Are Tough for Earthquakes
Implications of a new structural system in wharf design go far beyond San Francisco Bay, where two such wharves remained intact after the 1989 Loma Prieta quake. The design, introduced...

 

 

 

 

Return to search