Signal Analysis for Quantitative AE Testing
Quantitative acoustic emission (AE) techniques can be used to monitor crack growth and to deduce microfracture mechanisms in quasi-brittle materials. Multichannel data acquisition systems...

Monitoring Performance of Full Scale Structures
General Physics Services Corporation (GPSC) of Columbia, Maryland has developed a device for the remote long-term monitoring of full scale structures, such as highway bridges. This patented...

Teaching Structural Engineering in Year 2000
The paper addresses the need for changes in engineering education in order to keep pace with the changes that have and will continue to take place in the workplace. Over the past 40 years...

Interfacing Academia and the Practicing Profession
The paper presents a discussion of current topics and instructional methods in structural engineering in the United States. Following a review of typical subject matter in analysis and...

What Attributes Should the Structural Engineering Graduate Possess?
This paper will discuss the need for structural engineering students to be trained to think in terms of the performance of the structural system as a whole, rather than the individual...

Structural Analysis for the Student
The transition from student to practicing structural engineer can be a very 'eye-opening' experience. From the classical right-wrong classroom solutions of well-defined indeterminate structures,...

Structural Analysis in Context
The issues of what student should learn about structural analysis and how it should be taught are explored considering the purposes of structural analysis in engineering practice and the...

Inspections, Evaluations and Modifications for Corps of Engineers Dams
The Corps of Engineers owns and operates 580 dams in the United States. As these dams become older (199 are over 50 years old), dam safety and modifications play an increasing role in...

Embankment Dam Safety
Procedures for identification and evaluation of conditions which can lead to catastrophic dam failure through either piping or deep seated instability of the downstream surface are presented....

Twin Lakes Enlargement and Rehabilitation
The Twin Lakes Enlargement and Rehabilitation Project involves an enlarged embankment replacing a two-tiered reservoir system with a single, larger-volume reservoir and new appurtenances....

Transactions of the American Society of Civil Engineers 1992
Transactions of the American Society of Civil Engineers Vol. 157, 1992 contains abstracts for all ASCE journal papers and technical notes,...

Geometric Design Projects for Highways
An Introduction
This book provides an introduction to geometric design of highways by means of examaples and projects that emphasize basic specifications, approaches to preliminary route selection, alignment,...

IVHS: The Invisible Revolution
Federal funding for intelligent vehicle highway systems has increased a hundredfold since 1989, from $2 million to almost $200 million. Transportation planners are looking increasingly...

Driving Under a Construction Site
Throughout the summer of 1992, vehicles passed unimpeded through one of the most heavily traveled intersections in Los Angeles County as construction proceeded on a concrete light-rail...

Supply-Side Solutions
Although the crumbling bridge infrastructure has received much attention in the press and the engineering community over the past few years, the number of structurally deficient bridges...

What Do You Mean by That?
The engineering and construction profession, like any other, has its own buzzwords and jargon. But as terms become ingrained in the profession's lexicon, they take on different...

The Development of the CRWMS Transportation System
The Transportation System of the Civilian Radioactive Waste Management System (CRWMS) is being developed using a system engineering approach to ensure it is properly integrated into the...

Development of the Planning and Control Segment, CRWMS Transportation System
This paper discusses the current plans for the development of the Planning and Control segment of the SRWMS Transportation System. Each of the four Planning and Control subsystems are...

Development of the Field Operations and Carrier Segments, CRWMS Transportation System
This paper discusses the current status and plans for the development of the Field Operations and Carriage segments of the Transportation System of the Civilian Radioactive Waste Management...

Human Factors Engineering Program Plan for the Hanford Waste Vitrification Plant
The paper describes the overall human factors program plan while providing more specific information regarding the critical areas of criteria development, dispersed control areas and key...

 

 

 

 

Return to search