Sedimentation Aspects of Floodplain Management
This paper presents sedimentation aspects of a recent disastrous flood that occurred during September 10-12 1990 in the Han River basin, a central part of the Korean peninsula. The flood...

Effect of Manning's Roughness Coefficient in Simulating Flow Parameters in Natural Channels
Manning's roughness coefficients are presented for three of the oldest and largest irrigation canals in Egypt. The discharges ranges from 35 to 318 m3/s....

Calibration of Beni-Mazar Movable Bed Model
A sand-bed model representing a reach of the Nile River was constructed to study alternative solutions to maintaining the navigation channel. Flume tests were carried out first to determine...

Numerical Modeling of Proposed Channel Designs (J. F. Baldwin III), California
Ship simulator studies of proposed improvements to navigable waterways are a very important part of any assessment. The John F. Baldwin Channel (JFB) Project (Phase III) is a ship channel...

Drought-related West Tennessee Channel Bank Failures
Massive bank failures occurred in 1988 along a 14-kilometer reach of the lower Obion River channel in Dyer County, West Tennessee where the river flows through an abandoned Mississippi...

Project Controls on the Channel Tunnel Project
Establishing controls for a multi-facted, multi-billion dollar, privately financed, project which is run by two organisations created solely for that one project has been a major challenge....

Introduction to Immersed Tube Tunneling Symposium
Today's Symposium on Immersed Tube Tunneling is a continuation of a series of papers that began at Construction Congress '89 with discussion of mined tunnel subaqueous...

Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...

Electronic Communication Between Project Participants
Fragmentation in the U.S. construction industry is perceived as one of the major contributors to reduced productivity. Lack of communication may be the main difficulty. Communication is...

Surface Renewal Due to Large Flow Structures in Open Channel Flow
It is shown that under certain flow conditions, surface renewal cannot be understood as an exclusive result of the bursting occurring near the wall, as proposed by several authors. Flow...

A Gas Chromatographic Protocol for the Measurement of Krypton Gas in Water
This paper presents the results of a study to investigate the feasibility of using a gas chromatographic (GC) technique for the measurement of non-radioactive krypton gas concentrations...

Measurement of Stream Reaeration Rate Coefficients Using Propane Gas
Three determinations of the reaeration rate coefficient, K2, were made on a 1185-m reach of the upper Assabet River in Westborough and Northborough,...

Dissolved Oxygen and Woody Debris: Detecting Sensitive Forest Streams
Early watershed studies showed that timber harvesting and yarding could depress dissolved oxygen in nearby streams when fresh slash entered streams and streamside shade was reduced. State...

Gas Transfer Measurements on an Ice-Covered River
Wasteload allocation for existing and proposed pulp mills in the Athabasca River Basin of northern Alberta, Canada, necessitated measurement of the atmospheric reaeration rate, K2,...

Characteristics of Low-Slope Streams that Affect O2 Transfer Rates
Multiple-regression techniques were used to derive the reaeration coefficients estimating equation for low sloped streams: K2 = 3.83 MBAS-0.41...

Development of an Expert System for Estimating Stream Reaeration Rates
This paper describes a data base of measured reaeration coefficients organized to assist users with estimating coefficients for rivers and streams with hydraulic characteristics similar...

Gas Transfer at Hydraulic Structures
The objective of this paper is to identify and briefly summarize the state-of-the-art in measuring and describing gas transfer at hydraulic structures. Basic theory of mass transfer at...

Sidestream Elevated Pool Aeration Station Design
The Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) is constructing a system of five Sidestream Elevated Pool Aeration (SEPA) stations along the 35.8 mile Calumet River,...

Mechanical Aeration System Design for Reservoir Tailwater Enhancement
Low dissolved oxygen (DO) concentrations in tailraces below hydropower facilities has been identified as a problem at some projects during nongeneration periods. One technique which may...

Conflict in Water Management of James River, ND
Delivery of water from storage in Jamestown Reservoir to 898 acres of newly developed irrigation along the lower James River by the U.S. Bureau of Reclamation during the drought of 1988...

 

 

 

 

Return to search