Outlet Works Modifications at Abiquiu Dam
For the installation of a hydroelectric project at the Corps of Engineer's Abiquiu Dam in New Mexico, outlet works modifications that would not affect the structural integrity,...

Rehabilitation of Dams, Spillways, and Hydroplants
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. Concerns include deterioration of original construction materials,...

Development of Hanford Site Lysimeter Facilities
Lysimeters have been constructed at the Hanford Site near Richland, Washington to quantify mechanisms that affect migration of radioactive and hazardous waste in geologic media. The history...

Monte Carlo Simulation of Transport from Reserve Pits
A mathematical modeling study was performed to evaluate potential health and environmental risks due to contaminant transport from exploration and production well freshwater drilling mud...

Risk Assessment and Management of an Oil Contaminated Aquifer: A Case History Study
This paper concerns the provision of the basic information needed for the decision-making process regarding the remedial measures leading to reutilization of an oil contaminated aquifer....

Application of Decision Analysis in Groundwater Remediation Design
The design of groundwater remediation systems involves selecting from a set of design alternatives under conditions of uncertainty. A risk-based decision analysis approach is presented...

Risk-Based Decision-Making Regarding Mixed Waste Disposal Systems
An efficient approach has been developed for making rational and defensible decisions among a variety of 'options' (e.g., remedial actions, engineered barrier...

Health Benefits From the Use of Appropriate Technologies in Water Supply and Sanitation
Research on selected diseases in developing countries has found significant health impacts from water supply and sanitation interventions. Sanitation, personal and domestic hygiene, and...

Using Social Infrastructure in Support of Appropriate Technology
This paper proposes and argues for an expanded definition of social infrastructure, suggesting that the creation, adoption and maintenance of appropriate technology are dependent upon...

Application of Appropriate Technology in Hydroelectric Project Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. A primary concern is spillway and stability inadequacies resulting...

Sedimentation Aspects of Floodplain Management
This paper presents sedimentation aspects of a recent disastrous flood that occurred during September 10-12 1990 in the Han River basin, a central part of the Korean peninsula. The flood...

The Benefits of U.K. Guidance for Temporary Works
In British contracts the Contractor is responsible for the design and execution of temporary works unless the Design Engineer or the Client expressly instruct how the work is to be undertaken...

Current Legal Issues Impacting Temporary Works in Construction
There are two evolving areas of legal concern to the engineer and contractor involved in any aspect of temporary construction. The interpretation and application of the Occupational Safety...

Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....

Specifying Trench Safety: the Texas Experience
The frequency of accidents during trenching operations has grown so dramatically that the issue has caught the attention of both industry 'insiders' and 'outsiders.'...

Fall Protection & Debris Containment During Construction
The purpose of this paper is to review the current practices in the United States for both fall protection and debris protection during high rise construction. A performance comparison...

Temporary Traffic Deck Over Braced Excavation
A case history is used to examine the planning, design, and installation of a temporary traffic deck over a 23-foot-deep braced excavation. The deck was installed in a three-phase sequence...

Construction Accident Analysis: The Inductive Learning Approach
This paper presents the use of inductive learning in the analysis of construction accidents. It provides a brief description of ROUGH, an inductive system based on the theory of rough...

The CRANIUM: A Case Study of Sensory Improvement for Construction Equipment Operators
Machines excel at physical processes such as generating large forces and performing repetitive motions, but humans are still better at information intensive processes such as planning,...

Construction Quality Management
The Resident Management System (RMS) is a microcomputer based quality management and contract administration system designed specifically for resident engineers, by the Los Angeles District,...

 

 

 

 