MIS for Implementing Multi Project Programs
The successful implementation of large or small capital improvement programs must include more than the management of schedule and cost. An effective Program Management Team must be concerned...
Inspection and M&R Decisions for Infrastructure
This paper reviews different possible mathematical formulations for a joint inspection and M&R decision-making model, having various levels of restriction and computational complexity....
An Overview of Markovian Models for Bridge Management Systems
The typical infrastructure maintenance decision-making environment involves multiples objectives, uncertainty, and dynamics of the most commonly used infrastructure models, which captures...
Infrastructure Planning for Private Sector Investment
To minimize the use of public resources for infrastructure development, major works are being initiated in Latin America with studies designed to attract capital investment from the private...
Infrastructure Planning in Beirut, Lebanon
This paper presents a comprehensive framework for structuring the decision process of planning for transportation infrastructure rehabilitation and development in the city of Beirut, Lebanon....
Risk Analysis of the Financial Viability of the New Denver Airport
A risk analysis of the financial viability of the New Denver International Airport, conducted for the U.S. General Accounting Office, showed it highly unlikely that the new airport would...
Uncertainty in Infrastructure Management
The difference between committed costs and actual expenditure is a margin of control in project management. By using a measure of uncertainty we construct a cost-risk evaluation framework...
Digital Imaging as a Design Tool
On most engineering projects, schematic drawings offer a technical representation of a structure to clients. For staff or the public who are not technically knowledgeable, though, schematics...
Treating Uncertainty in the Design of Horizontal Curves
A model based on expected total cost minimization approach is developed for determining optimal horizontal curvature for highway sections. Expected total cost is defined as the sum of...
Risk Analysis Methodology for Life Cycle Benefit Analysis of Innovative Construction Technologies
The adoption of new construction technologies into practice moves very slowly since participants in the construction processes are extremely risk adverse. Innovation barriers are characterized...
Sensitivity Analysis of Financial Forecasts for MBTA Infrastructure Investment Program
This paper describes a financial analysis methodology and model developed for the Massachusetts Bay Transportation Authority (MBTA), which provides comprehensive projections of the relationships...
Case Study of Electronic Toll Collection in the Central Artery/Tunnel Project?Boston
The purpose of this paper is to discuss the issues involved in incorporating new technology, specifically electronic toll collection into a large, long-term construction project. The paper...
Use of Fuzzy Theory for Dealing with Uncertainty: Evaluating Alternatives Under Uncertainty
A method to deal with uncertainty which is associated with vagueness and ambiguity is presented. Fuzzy sets are introduced to account for vagueness in expression and fuzzy measure is introduced...
Experience in the Planning of High Speed Rail Lines: From Feasibility Studies to the Construction Project
For the construction of a new line for high speed traffic, a series of technical, commercial and economic studies must be carried out for each of the parts of the planning stage: the feasibility...
Establishing a HSGT System Organization
Most of the attention on High Speed Ground Transportation systems thus far has been devoted to their technological, financial and construction aspects, and this was understandable since...
The Pittsburgh Maglev Project
MAGLEV, Inc. is a public/private/labor partnership created in response to the ever growing need to provide new transportation solutions to the escalating problem of highway and airport...
Potential Statewide Impacts of Florida's Proposed High Speed Rail System
This paper presents a summary of the findings from an analysis of the potential statewide impacts resulting from the construction and operation of a high speed intercity rail system in...
High-Speed Surface Transportation Cost Estimating
The cost of building and operating high-speed surface transportation (HSST) systems in the United States is a critical factor in determining their feasibility. Costs are difficult to estimate...
The Megabight Barrier / Maglev Way?Innovative Siting of High Speed Ground Transportation...Offshore
Air and road traffic congestion around cities, e.g., in the BOSWASH corridor, can be reduced by high speed rail systems. But high speed trains on elevated rails/guideways encounter extra...
Contractor's Quality Program Requirements
To examine the applicability of modern QC/QA techniques to large HSGT infrastructure projects constructed by outside contractor consortia....