Modeling the Chaotic Behavior in Simple Shear Granular Flows
Simple shear granular flows have demonstrated a variety of puzzling phenomena. Both computer simulations and physical experiments have discovered particle grouping, layering and shear...
Mechanics of Granular Materials at Very Low Effective Stress Levels
Gravity's influence on laboratory specimens of uncemented granular materials subjected to low effective stresses, makes it impossible to evaluate constitutive properties in an unambiguous...
Influence of Gas Phase Turbulence on the Transport of Particles
An interesting and perhaps unexpected flow feature characterizing the transport of a gas-solid suspension in a vertical duct is the radial nonuniformity of particles over the tube cross-section....
Performance-Based Evaluation of Lunar Base Construction Equipment and Methods
Existing literature regarding the selection of lunar base construction equipment and methods is heavily dependent upon qualitative measures for evaluation of equipment concepts. Selection...
Hydrogen Reduction of Lunar Soil and Simulants
Carbotek, Inc., and the Energy and Environmental Research Center (EERC) are cooperating on further development of the Carbotek process to produce oxygen from lunar ilmenite by hydrogen...
On-Orbit Assembly and Refurbishment of Lunar Transfer Vehicles
Initial flights of space-based manned lunar transfer vehicles (LTV) will require some on-orbit assembly and checkout due to mass and volume limitations of the Earth-to-orbit (ETO) launcher....
Modular Robot Testbed
One approach to non-terrestrial construction involves the use of small, inexpensive, modular robots rather than expensive one-of-a-kind construction tools. The Modular Robots Testbed at...
Architectures for Mission Control at the Jet Propulsion Laboratory
One of the most vital, but often overlooked, research areas for space missions is flight operations. The imbalance is caused by many factors. Among them, the manner in which space missions...
Thermal Investigation of a Large Lunar Telescope
Recent interest in construction of a large telescope on the Lunar surface (Nein and Davis, 1991; Bely, Burrows, and Illingworth, 1989) has prompted this feasibility study of a thermal...
The Design and Use of Flow-Through Hold Pads
The Chicago Delay Task Force recommended the construction of nine largescale, flow-through hold pads at Chicago O'Hare International Airport to reduce the potential for airfield gridlock....
Fine Tuning the Airfield: The New Denver International Airport
This paper discusses airfield layout considerations that have been incorporated into the design of the new Denver International Airport (DIA). These concepts include some unique provisions...
The New Munich Airport?Planning, Construction and Opening of a New International Turnstile Airport in Europe
The new Munich airport that began operations just recently dates back to the mid-1950. The paper discusses the general expansion plan which includes site selection; runway system planning;...
Soft Touch People Mover Central Control
The people mover central control systems perform many automatic functions, are built with off-the-shelf redundant hardware, include advanced color graphics and touch screen operator interfaces,...
Baggage System Implementation at DIA
BAE Automated Systems is currently under contract to supply the complete, Integrated Automated Baggage Handling System (IABHS) for the New Denver International Airport. The system represents...
Planning and Budgeting for FAA Facilities and Equipment
Establishing new Federal Aviation Administration (FAA) facilities and equipment (F&E) requires long lead-time planning and through processing in a three-year budget cycle to achieve...
Impact of the New Denver Airport on the Air Traffic Control System
Building the new Denver Airport has two major impacts on air traffic control: first, it requires redesigning the airspace surrounding the Denver area; and second, it requires moving to...
The Airport Traffic Control Tower for the New Denver International Airport
Developing a new airport traffic control tower involves many complexities of planning, engineering, and coordination. For the ATCT at the New Denver International Airport, these complexities...
Analyzing Fast-Food Drive-Up Window Site Impacts
Peak-period queueing at a fast-food restaurant drive-up window was observed. The study found that queueing behavior equations based on random arrivals and service times overestimated the...
Estimation of Pass-By Trips Using a License Plate Survey
The objective of the study was to determine whether it is possible to estimate the percentage of pass-by trips using a license plate survey instead of the traditional interview survey....
Access Control to Projects Via Raised Islands
When addressing driveway maneuvers at a new development, alleged ailments Must be quantified before drafting a cure. If a problem is anticipated, alternative solutions should be investigated,...
Return to search