A Conflict Avoidance Methodology for Port Dredging Issues
Port dredging operations have often been the focus of controversy over environmental and funding disputes. This paper asserts that adversarial relationships among interested parties will...
Multiple Use Ocean Management in the U.S.: Toward a New Conceptual Framework
Problems with the sectorally based, largely single-purpose approach to the management of ocean resources and ocean space in the United States have been amply documented in recent years....
A Coastal Action Strategy for Southern Africa
The rapidly changing demands and circumstances in southern Africa are offering exciting new challenges in coastal zone management (CZM) and have highlighted the urgent need for effective...
An Evaluation of the Role of Port Administration in Comprehensive Planning and Management of the Canadian Coast?The Example of Vancouver
The current institutional approach adopted to plan and regulate developments in Canada's major ports is assessed. To determine the effectiveness of the Canadian approach,...
A Methodology for Coastal Monitoring
This paper sumarizes the routines which will be applied in order to create a methodology that will orient the 2nd phase of the Coastal Management Program in Brasil. The 1st phase, the...
Who is Taking Out the Garbage?
Due to the shortage of landfill space and the increasing amount of waste being generated, current waste disposal techniques should be studied and revised. New methods should be implemented...
Information Entropy and Environmental Engineering
Environmental engineering decisions are often made with limited information. In such cases it is useful to express uncertain quantities with a probability distribution. The use of information...
A New Graphic Technique for Reporting Soil Quality Analyses
Boston's Artery/Harbor Tunnel Project is currently the United States' largest highway construction project. One of its major issues is the disposal of an estimated...
Electronic Computation
This proceedings,
Connecting With DOTs
Want to bid on projects from state departments of transportation? First make sure your firm can translate computer-assisted drafting (CAD) drawings into different computer file formats....
Breaking Down the Barriers
The structural engineering of multistory buildings is a complex and time-consuming chore, but new design and analysis tools can greatly simplify the task. The article traces the development...
Monte Carlo Simulation Techniques for Predicting Annual Power Production
The problem of the creation of a simulation model utilizing the Monte Carlo method at a single site is addressed. The result of the analysis is a picture of the production at the site...
Evaluating Hydro Relicensing Alternatives?Impacts on Power and Non-Power Values
The relicensing of 300 hydroelectric plants in the next decade involves a total capacity of about 4,000 MW - a $10 billion value. A methodology recently developed by Decision Focus Incorporated...
Techniques for Balancing Instream Flow Needs with Project Operation
Balancing power and non-power benefits of hydroelectric developments has become a controversial issue in the relicensing of projects. Multiple project and multiple objective flow management...
Using Project Management Techniques in Hydro-Relicensing
To answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company (CMP) has applied the principles of project management,...
Document Image Systems for Hydro License Compliance
This paper will present one company's experience in selecting and implementing a document imaging system for management of correspondence, environmental studies, dam safety...
Calculation of Three-Dimensional Turbulent Flow in Francis Turbine Runner
A numerical scheme, based on MacCormack's predictor-corrector explicit finite volume method, for solving three-dimensional weakly compressible inviscid, laminar, and turbulent...
Design of Powerhouse Spiral Case Considering Three-Dimensional Action
A commonly used approach of designing semi-spiral cases for Kaplan turbine installation using two-dimensional frames becomes unsuitable for large diameter turbines and/or high heads. The...
Pressure-Time Flow Measurements Under Adverse Conditions
Theoretical analyses suggest that the pressure-time method is capable of accurately determining flow rate in the short, varying cross section, 'semi-scroll' penstocks...
Stability Analysis of Gravity Dam Foundations with Horizontal Seams
Determination of the overall factor of safety against sliding is an important aspect in concrete dam design. Limit equilibrium methods have serious limitations. A method for determining...
Return to search