Friant Power Project: Design and Construction?Non-Federal Power at a Reclamation Facility
Friant Dam, Millerton Reservoir, provides the principal water supply for the Friant Division Central Valley Project of the U. S. Bureau of Reclamation (Bureau). The dam is a 319-foot high...
Construction of Yellowtail Dam & Power Plant 63-65
The Yellowtail Unit of the Missouri River Basin project is located on the Bighorn River in south central Montana. The key feature of the unit is Yellowtail Dam which rises 525 ft. between...
Retrofitting Outlet Works of Existing Dams for Hydropower
This paper deals with three small hydroelectric plants installed at existing dams in California with moderately high heads (about 200 feet). In each case there was an overriding need to...
Economic Evaluation of Alternative Electric Power Developments
A hydroelectric-dominated power system and a thermal-dominated system represent different ways of meeting total electric demand, but with materially different cash flow patterns. This...
Kinetic Hydro Energy Conversion System Study
In early studies conducted at New York University (NYU) at the request of New York Power Authority (NYPA) a number of conclusions were reached regarding the resource and the types of kinetic...
Hoover Dam Plus Fifty Years Equals El Cajon Dam
The completion of El Cajon arch dam on the fiftieth anniversary of the completion of Hoover Dam has given the opportunity to compare design and construction of two concrete arch dams constructed...
Conventional Machinery/Unconventional Applications
The U. S. Bureau of Reclamation has become increasingly involved in small-scale hydroelectric projects involving unconventional applications for conventional hydraulic machinery. One ongoing...
Infrastructure Development and Turbine Building
Aggressive development schedules which characterize many projects imply a degree of construction management know-how or alternatively, may say something about the state of the industry...
Rehabilitation of a Pump/Turbine
Between 1964 and 1968, eight 212 in pump discharge diameter Baldwin-Lima-Hamilton vertical pump/turbines with Westinghouse motor/generators were installed in Philadelphia Electric Company's...
Uprating Francis Turbines Provides Additional Energy
The use of existing powerhouse, penstocks, dams and unit configuration, all provide for a quick cost effective method to increase output from an existing turbine installation. This paper...
Fishery Issues Slow Boardman River Redevelopment
At issue was the requirement of the Michigan Department of Natural Resources (MDNR) and the U. S. Fish and Wildlife Service to require the establishment of fish ladders at the hydro sites....
Hydropower Contract Conditions for Civil Engineering Works
Norwegian types of contract documents for hydropower construction work - especially the underground parts - have long had the reputation of being flexible as opposed to the traditionally...
HydroMAX; Computerized Hydropower Scheduling
The New England Power Exchange (NEPEX) is currently using the HydroMAX Program to schedule daily hydropower operations for the 17 stations in the 11,250 square mile Connecticut River Basin....
Generic Power System Stabilizer Design
The object of this paper is to describe the design considerations of a microprocessor based power system stabilizer operating through excitation control as applied to a multi-unit pumped...
Increasing Hydropower Operating Efficiency
A method is described for determining the most efficient use of hydro units in a multiple unit hydro plant. In a multi-unit plant enough flexibility exists to load a chosen set of units...
Independent Review of Truman Dam Operation
The Truman Dam in Missouri was constructed by the Army Corps of Engineers in 1979 as a pumped-storage facility. Due to fishkill and other controversies, the pumpback feature of the project...
An Economical Approach to Receiving Coal by Rail in the Sub-Arctic Environment
During the period 1983 to early 1985 a multimillion dollar coal transfer facility was designed and constructed in Seward, Alaska. The facility transfers coal from rail cars to temporary...
Optimal Design of Continuous Prestressed Concrete Girders
Design of continuous prestressed concrete girders with possibility of parabolically varying depth in each span is formulated in the form of a mathematical programming problem. The design...
Spanning Urban Obstacles
Extension of Pittsburgh's Crosstown Expressway is a � mile portion of a massive $500 million urban highway now under construction. The extension is a complex of five roadways...
Innovative Solutions to the Challenges of Heavy Civil Projects
Each heavy construction project presents unique conditions and challenges. For large projects, the work scope may justify an extensive engineering analysis and significant investments...