Functional Analysis of the Exploratory Studies Facility
This paper discusses the development of the 'Physical System Requirements-Exploratory Studies Facility' (PSR-ESF) document. Based on a functional analysis approach, this document includes...
Software Quality Assurance on the Yucca Mountain Site Characterization Project
The Yucca Mountain Site Characterization Project (YMP) has been involved over the years in the continuing struggle with establishing acceptable Software Quality Assurance (SQA) requirements...
Qualification of Existing Data for the Yucca Mountain Site Characterization Project
The U.S. Department of Energy (DOE) has completed its first effort to qualify existing data using NUREG-1298 'Qualification of Existing Data for High-Level Nuclear Waste Repositories'....
Application of Quality Assurance to Site Characterization
Siting studies for nuclear power plants are conducted for the purpose of determining the suitability of the site (a natural system) on plant systems that prevent the release of radioactive...
Potential Nuclear Material Safeguards Applied to the Department of Energy's Civilian Radioactive Waste Management System
The Office of Civilian Radioactive Waste Management (OCRWM) within the U.S. Department of Energy is charged with the responsibility of safe and efficient disposal of this Nation's civilian...
Safety Envelope Input: Nuclear Facility Isotopic Content (NFIC) Management System
The Westinghouse Savannah River Company (WSRC) is aggressively applying environmental remediation and radioactive waste management activities at the U. S. Department of Energy's (DOE)...
Cost and Schedule Baseline Management in the OCRWM Program
The Department of Energy's Office of Civilian Radioactive Waste Management has established a baseline change control system to support their program control system. The program control...
Application of the Global Positioning System to Locating Remote Sites
The location of Near Field (NF) sampling stations, used for the radiological monitoring program portion of the site characterization phase of the Yucca Mountain Project, were determined...
Project Control?The Next Generation
The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning...
A Computer Model for Multiplant Hydroelectric System Simulation
An interactive computer model of a multi-plant hydrothermal electric power generating system has been developed that roughly captures the main features of the British Columbia Hydro system....
Public Process in Fresno/Clovis Water Supply Plan
Groundwater is the principal reservoir for the Fresno/Clovis Metropolitan Area (FCMA) of Central California. However, significant portions of the aquifer are threatened by pesticides and...
Operating the Columbia River: A Balancing Act
Agreements to market the Canadian share of the hydroelectric power generated at U.S. facilities as a result of the Columbia River Treaty will begin terminating in 1998. Renewal of the...
The Economic Value of Trout Fishery Management Programs
The contingent valuation method is used to estimate the economic value of a trout fishing day at the Cache la Poudre River in Colorado. In addition, changes in daily economic value and...
Use of Flood Control Features for Environmental Mitigation
The US Army Engineer District, Vicksburg (CELMK), plans to construct up to 167 water control structures, 52 confined disposal facilities, and 47 barrow pits as part of a major flood control...
Innovative Wetland Re-creation in Urban Setting
The project site is a 106 hectare, mixed-used, commercial development east of Tampa, Florida and at the westerly limit of the town of Brandon, Florida. Delaney Creek traverses the site...
Development of Bioretention Practices for Stormwater Management
This paper introduces the concept of bioretention as an innovative stormwater quality management practice. Bioretention is a method to treat the first flush of runoff using a combination...
Columbia River System Operations ? Water Quality Assessment
In mid-1990, the U.S. Army Corps of Engineers, U.S. Bureau of Reclamation, and Bonneville Power Administration embarked on a Columbia River system operation review. Ten technical work...
Optimal Utilization of a Multi-Reservoir Water Distribution System
A water supply distribution system planning model (DSPM) has been developed using a linear programming approach. Unlike the conventional formulation, the water demand requirements are...
Geographic Information System Application: Water Right Places of Use as Polygon Attributes
A Geographic Information System (GIS) was tested for potential use as a water resource management tool by application to a ground water study area. Because of the limitations of the particular...
GIS Reconstruction of Exposure to Water Supply Contaminants
Groundwater pollution resulting from improper waste handling practices in the aerospace industry contaminated the water supply in Tucson, Arizona. State and federal health officials concluded...
Return to search