Regal Crossing
The 475 m long, asymmetrical cable-stayed bridge recently constructed in Bangkok at the behest of the king of Thailand features gold-colored stays, a sleek, enclosed deck structure, and...
Application of `SWAT2000' for Hydrological Modeling of Small Watershed in Eastern India
The present study deals with an application of a physically based continuous hydrological model (SWAT2000) forhydrological modeling of small agricultural watershed of Gowai river catchment...
Assessing Long-Term Pollutant Concentration Trends in Urban Runoff for TMDL Planning and Regulatory Assessment
Loads of some pollutants in many urban watersheds include a substantial component originating with non-point sources and stormwater runoff. TMDL planning includes estimating those loads,...
A Dynamic Climate Downscaling Prediction System for N.E. Brazil
The International Research Institute for climate prediction (IRI) is collaborating with several levels of government and various local and foreign researchers in several key disciplines...
Rate of Under-Registration Due to Failures of Large Meters
Leaks and meter under registrations are suspected as primary components of unaccounted-for water in Korea. In 2001, national unaccounted-for-water rate is reported as 26.6%. More than...
A Decision Support System for Drought Management Planning
Traditional drought management planning has focused on curtailment of demand by instituting voluntary or mandatory restrictions on water consumption when regional hydroclimatic indicators...
How Should the U.S. and Mexico Manage Their Transboundary Water Quality?
The purpose of this workshop is to discuss with ASCE members the progress in developing a Standards document and Management Plan document associated with water quality management across...
Developing a Long Term BMP Sampling Program - Initial Results from the Villanova Stormwater Urban Partnership
The Department of Civil and Environmental Engineering has teamed up with the Pennsylvania Department of Environmental Protection to create a directed studies and long term research center...
The Pocono Creek Goals-Based Watershed Management Pilot Study-Phase 2
Phase 2 of the Pocono Creek Pilot Study begins with focusing on the issues identified in Phase 1 and prioritizing them on a watershed wide scale. The Pocono Project worked through the...
Under Cover
In capping a 190-acre hazardous landfill in metropolitan Los Angeles, engineers saved time and money by relying on a construction method seldom used in the environmental sector: design/build....
Worthy Successor
Now under construction, the replacement for Florida's Hathaway Bridge, which crosses St. Andrew Bay in Panama City, will more than double the capacity of the existing structure....
The Water Resources Development Act for Restoration of Urban Waterway Superfund Sites
The objective of this paper is to provide information for interested parties to use in their evaluation of WRDA as a potential authority for completion of sediment remediation and restoration...
A Realistic Vision for the Future of IT in Civil Engineering and a Plan for Achieving It
In October 2001, a group of experts from the capital projects industry met in San Antonio, Texas to begin development of a comprehensive technology research and development (R&D)...
Failures and Problems with Lift-Slab Construction
This chapter provides an overview of failures and problems with lift-slab construction. Topics include jack systems with inadequate take-up devices; the Canadian wedge connection; Serra...
MAX Transit
Two expansions to the Metropolitan Area Express (MAX) light-rail transit system in Portland, Oregon, illustrate the value of exemplary planning and creative financing. The Airport MAX...
Storm-Water Strategy
Water pollution laws are certainly nothing new, but increased public scrutiny, beach closures, and media coverage�particularly in Orange County, California�have placed new pressures on...
The Education of Gerry Schwartz
During a career spanning more than three decades, ASCE's current president, H. Gerard Schwartz, Jr., has learned that the true measure of success is service to one's...
After the Flood
In June 2001, Tropical Storm Allison struck Texas, subjecting the Houston area to one of the most destructive floods in U.S. history. As part of the recovery effort, the Federal Emergency...
Larger Foraminifers as Contributors to Carbonate Beach Sands
Larger foraminifers are locally significant contributors to tropical carbonate sediments, particularly in the Indo-Pacific region. The two major factors influencing foraminiferal production...
Sewer (Asset) Inspection and Condition Assessment Tools Required, Benefits Realized and Lessons Learned
The Northeast Ohio Regional Sewer District (District) owns, operates and maintains a vast interceptor sewer system that serves the City of Cleveland and all or parts of 58 suburban communities....
Return to search