Construction Control for Earth and Rockfill Dams
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 27 This manual provides critical guidance for constructors...

Seattle Solutions
Many of Seattle's most important bridges are vulnerable to serious damage if a much-anticipated big earthquake hits. A city-wide study designated lifeline structures for retrofitting,...

Preparing for Pier A
Earthquakes, oil wells, contamination and unstable soil were among the challenges engineers faced as they prepared a site at California's port of Long Beach for the Pier A...

Artificial Neural Networks for Civil Engineers
Advanced Features and Applications
Sponsored by the Committee on Expert Systems and Artificial Intelligence of the Technical Council on Computer Practices of ASCE. This report illustrates...

Inspecting the Unknown (Available in Geo-Environmental Special Issue Only)
Unknown foundations have plagued civil engineers for years. In the case of underwater pilings, much time and money is spent inspecting for cracks, breaks or deterioration. Even then, visibility...

The Deep (Available in Geo-Environmental Special Issue only)
Despite a mere 1,500 ft separation, Baltimore's Oriole Park at Camden Yards and Ravens Stadium required vastly different deep foundation solutions. While Oriole Park is founded...

Rebuilding History
Deterioration of the second-oldest multiple-arch masonry viaduct in the country�in Canton, Mass.�threatened its ability to continue carrying Amtrak's Northeast Corridor trains,...

Geosynthetics in Foundation Reinforcement and Erosion Control Systems
The variety and number of applications of geosynthetics in goetechnical engineering continues to grow rapidly. This proceedings focuses on two specific applications: soil reinforcement...

Shake, Rattle and Hold (Available in Structural Engineering Special Issue Only)
In-situ lateral load tests of two bridge bents were conducted on Interstate 15 in Salt Lake City, Utah, to determine the strength and ductility of an existing concrete bridge and the improvements...

Opportunities in Asia
An Assessment of Construction Trends, Needs, and Potential Collaborations
Prepared by Civil Engineering Research Foundation. This book presents findings of a 1996 technology assessment mission to East Asia that examined the...

On Solid Ground (Available only in the Geoenvironmental Special Issue)
On four transportation projects in Portland, Ore., soil nails and micropiles are used as alternatives to conventional earth-retention and foundation systems. The use of soil nails and...

Game, Set and Match (Available Only in Geoenvironmental Special Issue)
The U.S. Open, which takes place in New York City at the end of August each year, is one of four prestigious Grand Slam tennis events drawing players and fans from around the world, and...

Recycling Penn Forest Dam
Almost since it's construction more than 30 years ago, the Penn Forest Dam had suffered severe seepage, leading officials in Bethlehem, Penn., to wonder how secure their largest...

Innovative Design and Construction for Foundations and Substructures Subject to Freezing and Frost
This proceedings, Innovative Design and Construction for Foundations and Substructures Subject to Freezing and Frost, consists of papers presented...

Seismic Analysis and Design for Soil-Pile-Structure Interactions
Pile foundations are used extensively to support structures in seismic regions around the world. For years, geotechnical engineers have neglected to consider the interaction soil-pile...

Florida's Big Bellies
FPL designed and installed double reverse tapered poles, affectionately called big belly because the width gradually increases toward the middle and narrows at both ends. The poles replace...

Grouting to Great Depths
Logan Martin dam on the Coosa River in Alabama has been plagued by underseepage since its construction in 1964. The karst forming the dam's foundation allows water to flow...

Guy Anchors and Foundations
This section describes typical types of guy anchors that are commonly used today. It is not the intention of this guide to provide direction for the design of the anchor or foundation...

Turnback Project Moves Ahead
The $202 million Muni Metro Turnback (MMT) Project, scheduled for completion in September 1996, includes an 840 ft section consisting of twin steel-lined tunnels that connects to the Embarcadero...

Start the Presses!
Turning an existing bleach manufacturing facility into a printing plant required careful structural design to support a wide range of production processes. The new Daily News facility...

 

 

 

 

Return to search