Willow Creek Dam--To Be or Not To Be
In Heppner, Oregon, several alternatives for flood control were considered. A concrete gravity dam constructed using roller compaction methods was selected because of the greatly reduced...
Willamette River Adjustments to New Spur Dikes
Severe bank erosion has caused recent local losses of up to 30 ft (9 m) per year of prime agricultural land along a half-mile (800 m) reach of the Willamette River, Oregon. The U. S. Army...
Oregon Bridge Features Innovative Bell Piers, Floating Falsework
The I-205 bridge, scheduled for completion in 1983, will be a final link in a 40-mile highway east of Portland, Oregon. the substructure and superstructure design featured unusual technology....
Return to search