Engineering Features of the Red Bluff Research Pumping Plant
In 1995, the construction of the Red Bluff Research Pumping Plant (RBRPP) was completed. The pumping plant is a research facility for evaluating the biological/engineering features of...
Hydraulic Performance of Open Channel Breaching
Flood flow in natural channels with floodplains is often confined in the main channel by the presence of levees. The hydraulic performance of these kinds of channels can be seriously affected...
Analysis of Bank Stabilization in Steep Complex Streams Using A Two-Dimensional Model
In cases where the channel is fairly uniform, and not divided, one-dimensional hydraulic models, such as HEC-2, generally give adequate results for scour evaluations and bank protection...
Genetic Algorithm Design of Piped Irrigation Systems
The design of piped irrigation systems is a complex matter. In its simplest form it involves the selection of the sizes of pipes and other hydraulic elements so as to ensure that the varying...
Effects of Approach Flow Conditions on Pump Sump Design
An important obstacle to the development of a generalized sump design is the variability of flow conditions in approach areas. The geometry and alignment of the areas immediately upstream...
The Scour at Bridges Management Program in Rhode Island
The Rhode Island Department of Transportation (RIDOT) has developed and implemented a comprehensive two-phase scour susceptibility program for screening and assessment of scour at bridges....
Hydraulic Studies for a Large Wetland
Coastal wetlands are highly biologically productive and provide spawning and feeding habitats for many aquatic organisms. As has happened to freshwater wetlands, about half of the tidal...
Santa Ana River Salt Marsh Restoration: Orange County, California, U.S.A.
As part of the All-River Plan of the Santa Aria River, the 92 acre Santa Ana River Marsh (Marsh) was constructed at the Pacific Ocean outlet in Orange County, California. This project...
The Impact of Numerical Precision on Optimal Groundwater Hydraulic Control
The numerical precision retained in the formulation of groundwater hydraulic control optimization problems can have significant impacts on the accuracy of the solution. Sources of imprecision...
A Surface Collection Design Approach on the Lower Columbia River
Surface collection and bypass of downstream migrating juvenile salmon has the potential to help improve the survival of the Columbia River salmon population. However, surface passage on...
Surface Bypass-Collector Concepts and Performance
Surfacetype bypass collectors and concepts are described. Biological and engineering requirements to pass juvenile salmonids at Snake?Columbia River dams are presented. The components,...
South Carolina Department of Transportation's Statewide Program of Bridge Scour Evaluation
The South Carolina Department of Transportation (SCDOT) has instituted a program to satisfy the FHWAs requirements to evaluate the scour potential of the Nations bridges. The SCDOT's...
Dynamic Analysis of Multi-Pool Irrigation Canal
This paper discusses the dynamic characteristics of an open multi-pool irrigation canal from robustness point of view. In particular, the presence of right-half plane zeros in an open...
System Downstream Control for On-Demand Irrigation Canals
A nonlinear programming (NLP) Model has been developed to assist downstream control for optimal control of canal systems, called system downstream control (SDC). The objective of system...
Successful Implementation of Grouted Boulder Grade Control Structures on Drainageways in the Denver Metropolitan Area
This paper describes the development of design guidelines for the Grouted Sloping Boulder drop structure as an alternative for the sloping riprap drop structure. A number of partial failures...
Groundwater Remediation Design When Pretty Good is Good Enough
This paper introduces some new approaches toward the optimal design of groundwater remediation systems or any other engineered systems. These new approaches primarily consist of making...
White River Fish Screen Project Planning and Design
In 1983, Puget Sound Power and Light Company (Puget Power) submitted a license application to FERC for the overall White River Project. One of the elements of the project application was...
Experimental Uncertainty and Measurement Errors in Hydraulic Engineering
The Task Committee on Experimental Uncertainty and Measurement Errors was formed to provide information and guidance on current practices used for describing and quantifying measurement...
1995: Where the Past (Paleoflood Hydrology) Meets the Present, Understanding Maximum Flooding
Paleoflood hydrology has become accepted in the scientific, engineering, and regulatory communities and increasingly is being used to complement engineering hydrology throughout the Rocky...
Salinity and Hydraulic Issues at a Constructed Wetlands
A constructed wetlands at Boulder City, Nevada was designed to use effluent pumped from the City's wastewater treatment plant. The design was complicated by the highly permeable...