Object-Oriented Finite Volume Dam-Break Model
This paper is devoted to Object-Oriented analysis and design techniques to two computational modules in the field of dam-breaking. The C++ Object-Oriented...
New Methods for Modelling Dam-Break Wave
Recent developments in numerical analysis for hyperbolic equations have led to new methods which solve shallow water equations including complementary equations for hydraulic jumps. An...
Two-Dimensional Dam-Break Flow Simulation in a Sudden Enlargement
The paper presents the use of a two-dimensional depth averaged mathematical model for an unsteady dam-break flow simulation in a sudden enlargement. Continuity and two momentum equations...
Free surface flow modelling on a complex topography
The aim of this paper is to describe the different construction stages and the validation of a free surface flow model on a complex topography. This model is based on the two dimensional...
Strain Measurement on the Runner of a Hydroelectric Turbine
Twelve strain gages were installed on the 10-m-diameter runner of Unit G-23 (700 MW) at Grand Coulee Dam, Third Powerhouse. The gages were located on both the pressure and suction sides...
Non-Intrusive Experimental Setup for Inflatable Dam Models
A method which allows for a non-intrusive evaluation of the dynamic response of the inflatable dams under overflow and impounding water conditions is presented. The internal pressure variations...
Probable Maximum Flood Estimation for New and Existing Dams
Although various attempts have been made to streamline the procedures to determine PMF hydrographs for the design of new and rehabilitation of existing dams, there still remains a great...
Natural and Dam Break Flood Routing in Mountain Rivers
The accuracy of four one-dimensional flood routing methods is assessed for extreme floods in various mountain river settings. This preliminary assessment focusses on the prediction of...
Nonlinear Hydrodynamic Pressures on Arch Dam Faces
A finite difference method was used to calculate the nonlinear hydrodynamic pressures on the rigid arch dam faces. The arbitrary reservoir shapes were transformed to a regular cubic by...
An Improved Design of Fishways Under High Variation of Headwater
For the purpose of mitigating environmental impact, it is necessary to build fish passing facilities for fish migration when a dam is constructed on a river. But when the headwater variation...
1993 Mississippi Record Stages and Levee Failures
Record-setting stages, flooding duration, and multiple levee failures are distinguishing features of the Mississippi River 1993 flood. The peak stages reached at stations along the Illinois...
Bed Load Prediction in Steep Mountain Rivers
The characteristics of the stream channel morphologies in a very steep mountain ravine are explained by the data obtained through the longterm field observation. The bed load transportation...
Management of Sediments on the Red River Waterway Project
The Red River is a large alluvial river system with the lower 280 miles currently being developed for shallow draft navigation. The navigation project entails construction of five locks...
Prediction of Accretion Below Muhuri Closure Dam in Bangladesh
An equation for prediction of siltation below a closure dam in the coastal area of Bangladesh has been developed using a diffusion equation of vertical transport of sediment. Applicability...
Alternatives for Overtopping Protection of Dams
Prepared by the Task Committee on Overtopping Protection of the Hydraulics Division of ASCE. This report summarizes the results of an inventory and...
Bearing Capacity of Soils
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 7 This U.S. Army Corps of Engineers engineering manual...
Detecting Dam Failures
Federal Energy Regulatory Commission guidelines say that unattended hydroelectric dams must be monitored against failure around the clock. Design and installation of failure monitoring...
The New Clark Bridge: Saddle-Draped Cables
The new $85 million, 108 ft wide Clark-Bridge replaces a 20 ft wide 1928 truss bridge at Alton, Ill., carrying US 67 over the Mississippi about one mile above the recently completed Lock...
RCC For Seismic Design
Throughout its 70-year existence, the Littlerock Dam in Southern California's National Forest has been the subject of concern. Located only 1.5 mi south of the San Andreas...
DSM Saves the Dam
The Miami Conservancy District built five flood control dams after the catastrophic flood of 1913 in Dayton, Ohio. Lockington Dam was one of these five hydraulic fill structures. The Ohio...