Project Layout
Microtunneling projects should be laid out with attention to the benefits and constraints unique to this construction process. The following recommendations address some of these concerns:...

Shaft Considerations
Jacking and receiving shaft locations should be selected to minimize the number of shafts and disruptions while not exceeding the practical limits of the drive lengths achievable for a...

Microtunneling Operation
The shaft should provide safe working conditions and fully support the ground. Jacking and receiving shaft support system and sizes are typically determined by the contractor. See Chapter...

The Joint Industry Development of a Recommended Practice for the Site Specific Assessment of Mobile Jackup Units
The mobile self-elevating (drilling) unit, or jack-up, has been central to the exploration and development of offshore oil and gas reserves. In recent years there has been an increased...

The Big Dig's Big Dig
Widely recognized as the most demanding component of Boston's Central Artery/Tunnel Project, the tunnel jacking work performed beneath operating rail tracks represents a quantum...

Deep Freeze
In engineering, overcoming a failure can sometimes be more instructive than completing a project with unqualified success. Such was the case with the collapse and repair of a force main...

Foundation Design for the Elevated Station
The Amundsen-Scott South Pole Station is located at an elevation of 2,850 m on the 3,200 m thick polar plateau, a field of ice and snow that is moving toward the ocean at a rate of 10...

Hovering Over the Harbor
The $600 million extension to the Hong Kong Convention and Exhibition Center features a highly sculpted roof inspired by the uplifting image of seabirds in flight, as well as a 300-ft-long...

Cliffside Correction
Construction of a 10 km sewer collector in Valpara�so, Chile, came to a halt due to construction difficulties experienced during pipe jacking operations. Analysis revealed not only construction...

The Invisible Infrastructure
Most developed countries have 50- to 100-year-old underground utility systems that carry far greater loads than their designs. They're difficult to repair or replace, yet...

Boston Blockbuster
The Central Artery/Tunnel project in Boston is probably the single largest publicly-funded transportation project in the country at present. The total cost will be between $8 and $10 billion...

The Great Canadian Bridge Slide
An aging multispan swing bridge had to be replaced in Trenton, Ont., with minimal interference to both river and road traffic, and without changing its alignment. The solution was to build...

The Prefab Tunnel
Jacking a prefabricated concrete arch through a railroad embankment to provide a new access ramp to the Don Valley Parkway in Toronto was done for the first time in North America. In September...

Concrete Pipe Trenchless Technology
Precast reinforced concrete pipe is the most commonly used pipe material for jacking operations. For over 90 years, concrete pipe techniques, procedures and applications established the...

Pipe Jacking Advances
Pipe jacking is the remote placement of pipes underground by means of a tunneling machine that carries a train of pipe behind it. This is a relatively new technology in the United States,...

Tunnel and Bridge Construction with Minimum Disturbance to Overhead Services
The rapid growth of pipe jacking over the last 20 years and the improvement and development of methods in terms of lengths of drive, size and ability to work in varying ground conditions...

New Cables for Old
In an eingineering first, the main suspension cables will be replaced on New York City's Williamsburg Bridge without closing it to traffic at any time. According to the design...

Top-to-Bottom Construction in High-Rise Buildings
This top-to-bottom construction method, called jackblock is a cousin of lift-slab. The main components are the jack and concrete block, hence the name. The top story of a building is constructed...

Jacked Pipe Provides Roof for Underground Construction in Busy Urban Area
Construction of a major underground station for the metro in Antwerp, Belgium was done in a busy downtown area employing a method that virtually eliminated ground subsidence. The method...

 

 

 

 