Back in Action

by Kelly A. Guild, P.E., (M.ASCE), lead structural engineer in WSP USA’s Herndon office and served as the lead bridge engineer for project design,
Pooya Azar, president with Martins Construction Corp., of Falls Church, Virginia, and oversaw the construction of the project,
John Michels, P.E., is the structures manager for the bridge design group in WSP USA’s Herndon, Virginia, office and was the project manager for design,



2020


Serial Information: Civil Engineering—ASCE, 2020, Vol. 90, Issue 7, Pg. 64-71


Document Type: Feature article

Abstract: At one of Northern Virginia’s most complex and notoriously congested intersections, the superstructure of a critical highway overpass was demolished, removed, and replaced in a single weekend. The design’s accelerated bridge construction techniques included three composite units that were prefabricated off-site and a customized very early strength latex concrete mix for the deck closure that provided the cure time, strength, and durability necessary to get the job done on time.

Subject Headings: Bridge design | Bridge decks | Infrastructure construction | Structural strength | Strength of materials | Traffic congestion | Intersections | Superstructures

Services: Buy this book/Buy this article

 

Return to search