Construction and Maintenance
bySubcommittee on Guyed Transmission Structures of the Committee on Electrical Transmission Structures of the Structural Engineering Institute of ASCE
Part of: Design of Guyed Electrical Transmission Structures
Abstract:
The purpose of this section is to identify construction and maintenance practices that are necessary in order to ensure that the final installation of the guyed structure adheres to the assumptions made in design and to minimize actions, during the service life of the line, that could compromise the integrity of the structure.
Subject Headings: Maintenance and operation | Construction management | Service life
Return to search