A Culvert for Abram Creek
by John Aldrich, P.E., (M.ASCE), Project Manager; Cleveland office of CDM,Mark Vilem, P.E., Chief Engineer; Cleveland's Dept. of Port Control,
Michael Oakland, P.E., Ph.D., (M.ASCE), Senior Geotechnical Engineer; CDM,
Serial Information: Civil Engineering—ASCE, 2003, Vol. 73, Issue 11, Pg. 64-69
Document Type: Feature article
Abstract:
To enable Cleveland's airport to expand, a mile-long section of stream located within a deep, steep ravine needed to be buried. The resulting culvert required a design that addressed significant hydraulic, geotechnical, and erosion control issues.
Subject Headings: Rivers and streams | Hydraulic design | Culverts | Geotechnical engineering | Erosion | Airports and airfields
Services: Buy this book/Buy this article
Return to search