Design of the Inlet/Outlet Tower for the Eastside Reservoir Project
by Robert P. McBean, (F.ASCE),Clifford D. Dillon,
Document Type: Proceeding Paper
Part of: North American Water and Environment Congress & Destructive Water
Abstract:
The Eastside Reservoir is currently being constructed near Hemet, California, by the Metropolitan Water District of Southern California. When completed in 1999, water will enter and be drafted from the reservoir through the Inlet/Outlet tower. In this presentation the tower configuration, operating features, hydraulic modeling, and structural design concept are described.
Subject Headings: Reservoirs | Hydraulic models | Structural design | Water resources | Hydraulic design | Urban areas | Structural models | California | United States
Services: Buy this book/Buy this article
Return to search