Roller Compacted Concrete Tailing Retention Dam

by Daniel L. Johnson,
Nigel A. Skermer,
Frank Bergstrom,



Document Type: Proceeding Paper

Part of: Roller Compacted Concrete III

Abstract:

A roller compacted concrete (RCC) dam has been designed for gold tailing impoundment in southeast Alaska. To minimize up front capital costs, the curved gravity dam with multiple outlet works and an overflow spillway for each stage, will be built in three stages. Various combinations of severe loading conditions were analyzed for the overall dam, interstage behavior, and foundation stresses. The design criteria required minimal total seepage and allowed for no seepage on the downstream face of any stage. Stepped spillways, which are becoming typical on many RCC dams, will be used to assist in flood flow energy dissipation. Design considerations included the speed of construction using RCC and the effects of the coastal wet weather conditions on construction in this area of the world. This paper presents an overview of the project and the analyses performed for designs.



Subject Headings: Concrete dams | Roller-compacted concrete | Mine wastes | Gravity dams | Stress analysis | Spillways | Compaction (material) | Alaska | United States

Services: Buy this book/Buy this article

 

Return to search