Calibration of a Movable Bed River Model
by G. E. Hecker, Rensselaer Polytechnic Inst, United States,J. Larsen, Rensselaer Polytechnic Inst, United States,
D. K. White, Rensselaer Polytechnic Inst, United States,
Document Type: Proceeding Paper
Part of: Sediment Transport Modeling
Abstract:
This paper discusses the calibration procedures used for a model study of three miles (5km) of the Arkansas River. A hydro-power station will be added to an existing Corps of Engineers (COE) project, Lock and Dam No. 13, and the overall objective of the study was to determine if operation of the powerhouse would have any effects on sediment patterns in the river.
Subject Headings: Rivers and streams | Power plants | Hydro power | Calibration | River and stream beds | Movable bed models | Hydraulic models | Arkansas
Services: Buy this book/Buy this article
Return to search