American Society of Civil Engineers


CEDB Search Results

To start your search, enter one or more words for each category you are interested in.
For help, click on the name of the Field(s) you want to use.
 
Document Type
Serial Title
All Text Fields
Author
Title
Subject Headings  
Year Range Start Year:   End Year:


Found 1211 Records with the keyword term of "Scheduling"

Displaying 100 records - please modify your search for better results.

2013  Construction Scheduling Using the Constraint Satisfaction Problem Method

2013  Cost and Schedule Savings from Directly-Driven Soil Nail and Innovative Fascia Systems

2013  Fast Hybrid Optimization Method for Effective Pump Scheduling

2013  GoRoSo: Feedforward Control Algorithm for Irrigation Canals Based on Sequential Quadratic Programming

2013  Heuristic Solution Strategy for the Sequential Ballast Water Exchange Problem

2013  Impact of Crew Scheduling on Project Performance

2013  LOB and CPM Integrated Method for Scheduling Repetitive Projects

2013  Operational Optimization: Water Losses versus Energy Costs

2013  PCIM: Project Control and Inhibiting-Factors Management Model

2013  Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey

2013  Response Time of a Canal Pool for Scheduled Water Delivery

2013  Short-Term Real-Time Reservoir Operation for Irrigation

2013  Simple ET0 Forms of Penman’s Equation without Wind and/or Humidity Data. I: Theoretical Development

2013  Train Routing Model and Algorithm Combined with Train Scheduling

2013  Water Application Efficiency and Adequacy of ET-Based and Soil Moisture-Based Irrigation Controllers for Turfgrass Irrigation

2012  Activity Criticality Index Assessment Using Critical Path Segment Technique and Interactive Simulation

2012  An Analytic Review of Earned Value Management Studies in the Construction Industry

2012  Analytical Methods for Deriving Work Zone Capacities from Field Data

2012  Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling

2012  BIM-Enabled Virtual and Collaborative Construction Engineering and Management

2012  Comparison of SWAP and FAO Agro-Hydrological Models to Schedule Irrigation of Wine Grapes

2012  Construction Change: Likelihood, Severity, and Impact on Productivity

2012  Construction Resource Allocation and Leveling Using a Threshold Accepting-Based Hyperheuristic Algorithm

2012  Controlling Path and Controlling Segment Analysis in Repetitive Scheduling Method

2012  Daily Work Reports–Based Production Rate Estimation for Highway Projects

2012  Developing a Serious Game for Construction Planning and Scheduling Education

2012  Development of Fuzzy Enabled Shuffled Frog Leaping Algorithm with Activity Splitting Allowed in Construction Project Scheduling

2012  Estimating Daily Surface Soil Moisture Using a Daily Diagnostic Soil Moisture Equation

2012  Evaluation of Dynamic Indicators for the Train Working Diagrams in Urban Rail Traffic

2012  Expanding-Disk Rain Sensor Dry-Out and Potential Irrigation Savings

2012  Finance-Based Scheduling for Multiple Projects with Multimode Activities

2012  Finding Least-Cost Pump Schedules for Reservoir Filling with a Variable Speed Pump

2012  Fuzzy Enabled Hybrid Genetic Algorithm-Particle Swarm Optimization Approach to Solve TCRO Problems in Construction Project Planning

2012  Green and Non-Green School Buildings: An Empirical Comparison of Construction Cost and Schedule

2012  Heuristic Method for Satisfying Both Deadlines and Resource Constraints

2012  Identifying Scheduling Inefficiencies for Industrial Projects Using the Flowline View: A Case Study

2012  An Improved Particle Swarm Optimization Algorithm for University Classroom Scheduling Problems

2012  Incorporation of Computer Simulations into Teaching Linear Scheduling Techniques

2012  Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance

2012  Integrated BIM/Lean Base Production Line Schedule Model for Modular Construction Manufacturing

2012  Integrated Wagon-Flow Allocation and Shunting Locomotive Scheduling Problem at Railyard with Multiple Locomotives

2012  Irrigation Patterns and Scheduling of a Telecontrolled Irrigation District in Northeastern Spain

2012  Long Term Expanding-Disk Rain Sensor Accuracy

2012  Management and Maintenance Scheduling of Infrastructural Facilities: Road Map

2012  Maximizing Labor Stability As a Sustainability Performance Indicator in Project Scheduling

2012  Modeling Measures of Float Monetization for Quantitative Risk Management of Construction Projects

2012  Modified Time Impact Analysis Method

2012  A Multi-Objective Scheduling Model for Solving the Resource-Constrained Project Scheduling and Resource Leveling Problems

2012  Optimizing the Schedule of Dispatching Earthmoving Trucks through Genetic Algorithms and Simulation

2012  Performance of Shuffled Frog-Leaping Algorithm in Finance-Based Scheduling

2012  Quarter-Hourly Operation of Hydropower Reservoirs with Pumped Storage Plants

2012  Reliability-Based Framework for Determination of Fitness for Service of Corroding Metal Pipes

2012  Research on Hydraulic Optimal Operation Scheduling of Multi-Heat Source Co-Heating Network

2012  Research on the Dynamic Scheduling Problem of a Bottleneck in an Emergency Based on Improved GA

2012  Research on the Genetic Algorithm in Nurse Scheduling Problems

2012  Resource-Constrained Critical Path Scheduling by a GRASP-Based Hyperheuristic

2012  Schedule Assessment and Evaluation

2012  Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects

2012  Sectoral Conjunctive Use Planning for Optimal Cropping under Hydrological Uncertainty

2012  Short-Term Optimal Operation of Hydropower Reservoirs with Unit Commitment and Navigation

2012  Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head

2012  Simulation-Based Approach for Estimating Project Completion Time of Stochastic Resource-Constrained Project Networks

2012  Simulation-Based Auction Protocol for Resource Scheduling Problems

2012  Stochastic Project Financing Analysis System for Construction

2012  Using the Earned Value Management System to Improve Electrical Project Control

2012  Vehicle Scheduling Optimization of Biomass Supply Logistics: A Case of Power Plant Supply Chains

2012  Web-Based Risk Assessment Tool Using Integrated Duration-Cost Influence Network Model

2011  Algorithm for Electric Multiple Unit Scheduling Based on High-Speed Railway Network

2011  Ant Colony Algorithm Based on Vehicle Scheduling Problem with Time Windows under Emergency Conditions

2011  Ant Colony Algorithm for Regional Bus Scheduling Problem with Bus Task Reliability

2011  Automatic Look-Ahead Schedule Generation System for the Finishing Phase of Complex Projects for General Contractors

2011  Bus Rapid Transit Scheduling Optimal Model Based on Genetic Algorithm

2011  Bus Regional Scheduling Model Based on Improved Genetic Algorithm

2011  Computerizing ICBF Method for Schedule Delay Analysis

2011  Crew Plan in Condition of Designated Cycle for Passenger Dedicated Lines

2011  Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects

2011  Development of 5D CAD System for Visualizing Risk Degree and Progress Schedule for Construction Project

2011  Efficient Hybrid Genetic Algorithm for Resource Leveling via Activity Splitting

2011  Environmental Permitting for Pipeline Projects

2011  Estimating Highway Construction Production Rates during Design: Elements of a Useful Estimation Tool

2011  Evaluation of Reference Evapotranspiration Estimation Methods under Southeast Australian Conditions

2011  Fast and Accurate Risk Evaluation for Scheduling Large-Scale Construction Projects

2011  Freeway Dynamic Resource Scheduling Optimization and Comparison of Adaptability

2011  Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities

2011  A Generalized Time-Scale Network Simulation Using Chronographic Dynamics Relations

2011  Grading of Train Operation Conflicts

2011  Integrating Efficient Resource Optimization and Linear Schedule Analysis with Singularity Functions

2011  Irrigation Scheduling for Green Bell Peppers Using Capacitance Soil Moisture Sensors

2011  Linear Scheduling Model with Varying Production Rates

2011  Modeling Tool to Support Budgeting and Planning Decisions for Pump Overhauls

2011  Multi-Objective Emergency Resources Scheduling Model Based on Utility Optimization

2011  Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects’ Portfolio

2011  A Multi-Objective Model about Period Train Timetable Problem and a Heuristic Algorithm Based on Precedence Order of Train Sections

2011  Multi-Objective Optimization Model and Algorithm of Through Passenger Trains’ Departure Time Range

2011  Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling

2011  A New Model for Solving Integrated Wagon-Flow Allocation and Shunting Locomotive Scheduling Problem at Railyard

2011  Noise Charges in Road Traffic: Pricing Schedule Based on the Marginal Cost Principle

2011  Optimal Train Operation for Minimum Energy Consumption Considering Track Alignment, Speed Limit, and Schedule Adherence

2011  Optimization Model of Dynamic Emergency Resources Scheduling in Expressway

2011  Optimization of Construction Schedules with Discrete-Event Simulation Using an Optimization Framework