American Society of Civil Engineers


CEDB Search Results

To start your search, enter one or more words for each category you are interested in.
For help, click on the name of the Field(s) you want to use.
 
Document Type
Serial Title
All Text Fields
Author
Title
Subject Headings  
Year Range Start Year:   End Year:


Found 4021 Records with the keyword term of "Rehabilitation"

Displaying 100 records - please modify your search for better results.

2013  Advances in Design Methodology for Landslide Repair Using Launched Soil Nails

2013  AEI 2013, Building Solutions for Architectural Engineering

2013  Anchorage Devices Used to Improve the Performance of Reinforced Concrete Beams Retrofitted with FRP Composites: State-of-the-Art Review

2013  An Approach for Capturing Requirements of Collaborative Design Teams to Facilitate Evaluation of Energy Efficient Retrofit Design Options

2013  Assessing the Impact of Using Photographic Images to Influence Building Retrofit Design Education

2013  Blast and Earthquake Resistant Bridge Pier Concept: Retrofit and Alternative Design Options

2013  Bonding Integrity Study between Steel Pipeline and Composite Wraps Using Structural Health Monitoring Technique

2013  Comparative Study of Energy Efficiency of Glazing Systems for Residential and Commercial Buildings

2013  Comparison of Erosion Susceptibility and Slope Stability of Repaired Highway Embankment

2013  Condition-Dependent Maintenance Effectiveness in Dynamic Performance Models for Transportation Infrastructure

2013  Context Is Everything

2013  Current and Emerging Water Main Renewal Technologies

2013  Detailed Analysis of the Construction, Operating, Maintenance, and Rehabilitation Costs of Green Toronto Schools

2013  Determining Safety Climate Factors in the Repair, Maintenance, Minor Alteration, and Addition Sector of Hong Kong

2013  Development of a Missing Post Repair Guideline for Longitudinal Barrier Crash Safety

2013  Development of Ring-Shaped Steel Plate Shear Walls

2013  Factors Affecting the Ultimate Condition of FRP-Wrapped Concrete Columns

2013  Fatigue Crack Formation and Repair Strategies for Steel Cantilever Bracket Tie Plates

2013  Financial and Environmental Payback Periods of Seismic Retrofit Investments for Reinforced Concrete Buildings Estimated Using a Novel Method

2013  Flexural and Shear Behavior of Reinforced Concrete Members Strengthened with a Discrete Fiber-Reinforced Polyurea System

2013  Forensic Information Modeling: A New Forensic Tool

2013  Functionality of Damaged Steel Truss Systems Strengthened with Posttensioned CFRP Tendon

2013  Geo-Congress 2013, Stability and Performance of Slopes and Embankments III

2013  Homestead Grays Bridge Rehabilitation and Widening

2013  Improving Campus Chilled Water Systems with Intelligent Control Valves: A Field Study

2013  Inception Point for Embankment Dam Stepped Spillways

2013  Investigation of the Post-Cracking Dynamic Behavior of Masonry Structures Retrofitted with CFRP

2013  Laboratory Study of Fish Passage and Discharge Capacity in Slip-Lined, Baffled Culverts

2013  Learning from Failure of a Long Curved Veneer Wall: Structural Analysis and Repair

2013  Life-Cycle Cost Based Optimal Retrofitting of Structures by Fluid Dampers

2013  Main Street Bridge Project, Danville, VA Open Spandrel Concrete Arch Bridges: New and Old

2013  Markovian Bridge Maintenance Planning Incorporating Corrosion Initiation and Nonlinear Deterioration

2013  Mortar Joint Maintenance - From Abomination to Preservation

2013  The Need for Change and Dependency Management in Energy Efficient Retrofit Projects

2013  Numerical Investigation on the Hysteretic Behavior of RC Joints Retrofitted with Different CFRP Configurations

2013  Optimization-Based Regional Hurricane Mitigation Planning

2013  Performance-Based Seismic Evaluation and Retrofit of Suspension Bridges

2013  Proposed Design Process for Deep Energy Savings in Commercial Building Retrofit Projects

2013  Rankin Bridge Rehabilitation

2013  Rapid and Affordable Seismic Retrofit of Substandard Confined Masonry

2013  A Rapidly Deployable Bridge System

2013  Rehabilitation of TDOT’S SR56 Deck Truss Bridge Crossing Center Hill Lake

2013  The Reincarnation of Lake Townsend Dam

2013  Research Needs for Seismic Rehabilitation of Sub-standard Buildings using Stiff Rocking Cores

2013  Retrofitting Earthquake-Damaged RC Structural Walls with Openings by Externally Bonded FRP Strips and Sheets

2013  Scheduling Model for Rehabilitation of Distribution Networks Using MINLP

2013  Seismic Performance and Global Ductility of Reinforced Concrete Frames with CFRP Laminates Retrofitted Joints

2013  Seismic Retrofit of a 1960’s Steel-Frame Industrial Building In Washington State Using Viscous Dampers

2013  Shake Table Tests on FRP-Rehabilitated RC Shear Walls

2013  Shaking Response of Tall High-Voltage Equipment Retrofitted with Friction Dampers

2013  Soil Improvement for Seismic Retrofit of Tuttle Creek Dam

2013  Statistical Characterization of Reinforced Concrete Beams Strengthened with FRP Sheets

2013  Stochastic Energy Simulation for Risk Analysis of Energy Retrofits

2013  Strengthening and Repair of Reinforced Concrete Beams Using External Steel Plates

2013  Strengthening of Slab Action in Transverse Direction of Damaged Deck of Prestressed Box Girder Bridge

2013  Strengthening Square Reinforced Concrete Columns by Shape Modification and CFRP

2013  Structural Performance Assessment and Retrofit of Reinforced Concrete Buildings Under Seismic Loads

2013  Structures Congress 2013, Bridging Your Passion with Your Profession

2013  Sustainable Approach for Optimal Steel Sheet Pile Structure Assessment, Maintenance, and Rehabilitation

2013  Towards an Integrated Process Model and Decision Support System for High Performance Green Retrofits

2013  Transit Agency Repairs Historic Eads Bridge

2013  Waste Not Thy Hour: The Innovative, Fast-Tracked Reconstruction and Seismic Rehabilitation of Whatcom Middle School

2012  Achieving Sustainable Urban Renewal in Hong Kong: Strategy for Dilapidation Assessment of High Rises

2012  Analysis of Hydraulic and Combined Sewer Overflow Performance Indicators

2012  Analysis of Wastewater and Water System Renewal Decision-Making Tools and Approaches

2012  Applicability of FRP Systems for Retrofitting Existing Buildings to Prevent Progressive Collapse

2012  Application of Fuzzy Concepts to the Visual Assessment of Deteriorating Reinforced Concrete Structures

2012  Assessing the Effectiveness of Compaction Grouting Using Seismic Methods

2012  Assessment and Design Procedure for the Seismic Retrofit of Reinforced Concrete Beam-Column Joints using FRP Composite Materials

2012  Attempt for Seismic Retrofit of Existing Substandard RC Members under Reversed Cyclic Flexural Effects

2012  Behavior of Large-Scale Concrete Columns Wrapped with CFRP and SFRP Sheets

2012  Behavior of Light-Framed Wood Roof-to-Wall Connectors Using Aged Lumber and Multiple Connection Mechanisms

2012  Behavior of Slender Steel-Concrete Composite Columns Wrapped with FRP Jackets

2012  Blast Loads in and Urban Environment

2012  Blast Testing and Analytical Evaluation of Polymer Retrofits for Unreinforced Masonry Walls

2012  Bridge Seismic Retrofit Program Planning to Maximize Postearthquake Transportation Network Capacity

2012  The Building Code and Repairs to Damaged Structures

2012  Can It Handle the Pressure? Condition Assessment, Structural Evaluation, and Repair of an Existing 72 Inch PCCP Pipeline

2012  Carno Dam Case History of Investigation and Remedial Works

2012  Case Study: Failure and Repair of Historic Wood Trusses at St. John the Baptist Church, Hoboken, NJ

2012  Case Study of Strategies for Seismic Rehabilitation of Reinforced Concrete Multicolumn Bridge Bents

2012  A Case Study on the Use of Advanced Fiber Wrap Composites for Reinforced Concrete Repair of an Industrial Coker Reinforced Concrete Frame

2012  Causes of Longitudinal Cracks on Newly Rehabilitated Jointed Concrete Pavements

2012  CFRP Repair and Strengthening of PCCP for Thrust Restraint

2012  Challenges Encountered Retrofitting an Existing Concrete Building Classified As an Essential Facility

2012  City of Westminster’s Sewer Collection System Assessment Program: A Case Study

2012  Closing the Gap between Wood NDT Technologies and Repair Methodologies

2012  Combining CFRP Lining Systems with Other Pipeline Rehabilitation Technologies

2012  Common Pathologies in Composite Adobe and Reinforced Concrete Constructions

2012  A Comparative Study of Seismic Retrofitting of a Steel Benchmark Structure Using Various Types of Passive Controllers

2012  Comparing Blast-Resistant Concrete Column Retrofit Materials from a Cost Perspective

2012  Comparison of Longitudinal Unevenness of Old and Repaired Highway Lanes

2012  Comprehensive Study on Using Externally Bonded FRP Composites for the Rehabilitation of Reinforced Concrete T-Beam Bridges

2012  Compressive Behavior of Longitudinally Cracked Timber Columns Retrofitted Using FRP Sheets

2012  Condition Assessment of 23 Lift Stations

2012  Condition Assessments Using Pipe Penetrating Radar: The Metro Wastewater Reclamation District, Denver, CO—Harvard Gulch Interceptor Case Study

2012  Converging Stepped Spillways: Simplified Momentum Analysis Approach

2012  Cost-Effectiveness of Wind Retrofit Measures

2012  CSM-Cutter Soil Mixing - Worldwide Experiences of a Young Soil Mixing Method

2012  Decision Support System for Lateral Pipe Rehabilitation: Case Study Analysis