American Society of Civil Engineers


CEDB Search Results

To start your search, enter one or more words for each category you are interested in.
For help, click on the name of the Field(s) you want to use.
 
Document Type
Serial Title
All Text Fields
Author
Title
Subject Headings  
Year Range Start Year:   End Year:


Found 2087 Records with the keyword term of "Pipelines"

Displaying 100 records - please modify your search for better results.

2015  Application and Pipeline Vertical Displacement Analysis of Chemical Grouting for Pipeline Position Restoration Method

2015  Fully Automated As-Built 3D Pipeline Extraction Method from Laser-Scanned Data Based on Curvature Computation

2014  16 mi Water Transmission Main Utilizes Multiple Materials and Methods to Overcome Alignment Challenges in the Florida Panhandle

2014  Acoustic Emission (AE)-Based Leak Detection of Galvanized Steel Pipe Due to the Defects of the Screw Thread Connection

2014  Additional Design Considerations for Special Applications of Steel Pipe

2014  Advanced Acoustic Monitoring for PCCP

2014  Alternative Identification Methodology Maximizes Flexibility in Selecting Preferred Alternative for the Arkansas Valley Conduit

2014  Alternative Project Delivery: iPod or New Coke?

2014  Analysis of a 60-In. PCCP that Failed without Warning from Acoustic Fiber Optic System

2014  Analysis of Cement Mortar Lining in the Presence of Hydrodynamic Loading

2014  Analysis of Chinese Pipe Burst Events Reported by Web Media in 2013

2014  Analysis of Grouting Impact on Soil Displacement in Pipe Jacking Construction

2014  Analysis of Horizontal Directional Drilling Construction Risks Using the Probability-Impact Model: A Contractor’s Perspective

2014  Analysis of Internal Corrosion Reasons for an Old Crude Oil Pipeline

2014  Analysis of the Wind Vibration Response of Suspension Cable Crossing Pipeline

2014  Analysis of Water Distribution Buried Jointed Pipe Networks Subjected to Seismic Waves Considering the Nonlinear Behavior of Connections

2014  Analyzing Transient Behavior and Cost Effectiveness of a TSE Transmission Line Considering Different Pipeline Materials

2014  Application of a Powercrete Coating for the Yellow River HDD Crossing Pipeline

2014  Application of Ground-Penetrating Radar to Detect the Continuity of Strata around Pipelines

2014  Application of Trenchless Pipeline Rehabilitation Technology

2014  Application of UV CIPP in the Sewer Renewal of Baozhou Road in Quanzhou City, China

2014  Application Research of Quantitative Risk Assessment (QRA) Technology for Station Design of Natural GAS Pipelines

2014  Automated Productivity Analysis of Pilot Tube Microtunneling Installations through Workflow Recognition in the Time-Series Data of Hydraulic Pressure

2014  Babe Ruth Drank Water from that Pipe? Upgrading a Century-Old Infrastructure in an Urban Environment

2014  Balancing Innovation with Historical Practices in Standards Development

2014  Balch Consolidated Conduit Transient Condition

2014  Behavior of Reinforced Thermoplastic Pipe (RTP) under Tension

2014  A Better Tool to Perform Double Block and Bleed Tapping and Plugging to Isolate Sections of Pipe for Repair or Modification

2014  Biodeterioration of Portland Cement Mortar Produced by Sulfur Oxidizing Bacteria

2014  Breaking the Asset Management Mold: Why a Statistical Approach May Make More Sense

2014  Can Users Benefit from Pipe Standards that Allow Less Conservative Pressure Classifications?

2014  Case Study of More than 10 Years of Maintaining Adequate Cathodic Protection Levels on a Campus with Mixed-Use Product Pipelines

2014  Casselberry Asbestos Cement Pipe Bursting Project: Moving Forward by Leaving It Behind

2014  A Cautionary Tale about Unextended Proprietary Restrained Joints for Ductile Iron Pipe

2014  Centrifuge Model Test for Buried Inner Rehabilitated Pipes Affected by Aging Pipes with Different Damage Levels

2014  C-Factor Testing as a Condition Assessment Tool for Wastewater Force Mains

2014  CFRP Renewal of PCCP: An Overview

2014  Chaihe Directional Drilling Technology Solutions Round Gravel Layer Processing

2014  Challenges Faced in the Design of Large-Diameter Forcemain: Dundalk Pumping Station Forcemain Replacement, City of Baltimore, Maryland

2014  City of Port Angeles, WA: Large-Diameter Bundled Slipline for a CSO Diversion Project

2014  The City of Portland’s Search for Environmentally Preferable Pipe Materials

2014  City of San José Uses Creativity to Keep a Critical Link from Becoming a "Missing Link"

2014  Classification Algorithm of Decision Tree Applied in Water Supply Network

2014  Combined Sewer System Capacity Risk Assessment and Mitigation

2014  Comparative Analysis and Application of the Rock Salt Deformation Parameter Determination Method

2014  Comparative Analysis by Numerical Simulation on Natural Gas Pipelines in Different Positions of Landslide

2014  Comparing Different Embedment Options for an Open-Cut Pipeline Project

2014  Complex Infrastructure Projects Made Simple

2014  Conceptual Cost-Estimating Model for Water and Sewer Projects

2014  Concrete Bar-Wrapped Cylinder Pipe (C303) Condition Assessment and Verification Increases Reliability of TRA’s Water Delivery

2014  Concrete Bar-Wrapped Cylinder Pipe (C303) Condition Assessment Increases the Reliability of the City of Calgary’s Water Infrastructure

2014  Conquering Construction Challenges during PCCP Rehabilitation

2014  Construction and Commissioning of a Complex Wet Weather Storage System in Baton Rouge

2014  Construction Dewatering Near Environmentally Sensitive Locations

2014  Construction Management of a 30" Seawater Line Replacement, Alaska, North Slope

2014  Construction of a Large-Diameter Pipeline in Soft Soils between Two Reservoirs Using Alternative Project Delivery Method

2014  Corrosion Control Strategies to Protect Linear Assets: Dundas Street Sanitary Sewer and Forcemain Project, Oakville in the Region of Halton, Ontario, Canada

2014  Crude Oil Pipeline Operation and Optimization

2014  Cure Behavior of Epoxies Used for CFRP Repair of Pipelines

2014  Current Proposed Changes to AWWA M11 Steel Pipe: A Guide For Design and Installation

2014  DC Water’s Rapid Repair of a Waste Water Treatment Plant Piping System

2014  DEM Analyses of an Uplift Failure Mechanism with Pipe Buried in Cemented Granular Ground

2014  Design and Development of a Nonintrusive Pressure Measurement System for Pipeline Monitoring

2014  Design and Installation of Auger Steel Catenary Risers

2014  Design Challenges and Solutions to a River Water Transmission System

2014  Design of a Large-Diameter Wastewater Line under the Confines of a Storm Channel, from a Designer’s and an Owner’s Perspective

2014  Design of Supplementary Intake from Lake Sakakawea for the Southwest Pipeline Project

2014  Design of Utility Pipelines through an Active, Urban Landslide: The City of Astoria’s 11th Street Combined Sewer Overflow Separation Project

2014  Design, Pipe Material Selection, and Manufacture for the Lake Texoma Outfall Raw Water Pipeline: Genesis of a Fast-Paced Large-Diameter Project

2014  Detecting the Effects of Inadequate PCCP Bedding

2014  Detection of Localized Deterioration Distributed along Single Pipelines by Reconstructive MOC Analysis

2014  Determination and Analysis of the Water Consumption Variance Curve for a Water Distribution System

2014  Determination of the Thermal Exchange Coefficient between Subsea Soil and Buried Submarine Pipeline

2014  Developing a Successful Wastewater Collection System Rehabilitation Program in Corpus Christi, Texas

2014  Developing a Workable Condition Assessment Program When Your Budget Is Extremely Limited

2014  Development and Research of a Sine Signal Source with VLF Based on FPGA

2014  Development of a Risk Assessment Tool for Managing PCCP Assets with Broken Wires

2014  Diagnosis of a Pipeline System for Transient Flow in Low Reynolds Number with Impedance Method

2014  Digging in the Dark: Making Asset Management Decisions in the Age of Imperfect Information

2014  Directional Drilling Applications in Adverse Geological Conditions—The Qinghe River Directional Drilling in the Qingtie Route

2014  Discharge Pipes for a 875,000 gpm Pump Station

2014  Do Broken Prestressing Wire Wraps at the Joint Affect the Safe Operation of a Pipe?

2014  A Dynamic Classification Model for Seismic Monitoring Stations’ Placement Optimization in Urban Water Distribution Network

2014  Early Selection of Check Valve Type Considering the "Slam" Phenomenon

2014  Effects of Tunnel Shape on Water-Sealed Oil Storage Caverns’ Seepage Flow

2014  Electromagnetic Method (EM) Applied to Detect Underground Pipes

2014  Environmental and Design Challenges for a 1,500 mm Diameter Steel Pipeline River Crossing

2014  Envision: A Measure of Infrastructure Sustainability

2014  EPBS Tunnel Construction in Soft Soil and Fractured Formation: A Case Study of LanZhou Subway Line 1

2014  Establishing Right of Way: Large-Diameter Pipelines in Urban Areas

2014  Estimation of Pipeline Scour due to Waves by GMDH

2014  Evaluating Fitness-for-Service of Corroded Metal Pipelines: Structural Reliability Bases

2014  Evaluating the Resiliency of the Water System in Charleston, South Carolina against Liquefaction Hazard through the Use of Seismic Hazard Maps

2014  Evaluating Use of Large-Diameter HDPE Pipe for Water Transmission Applications

2014  Evaluation for Landslide Hazards along the Oil and Gas Pipeline in a Construction Period Based on AHP-Fuzzy

2014  Evaluation of the Structural Performance of Epoxy Linings for Manhole Rehabilitation Using Laboratory Testing and FEM Simulations

2014  Evaluation Technique of Downhole String Erosion and Corrosion under Complex Environment

2014  Experimental Basis of CFRP Renewal of PCCP

2014  Experimental Investigation on Rapid Filling of a Large-Scale Pipeline

2014  Exposure: Polyurethane Coating Response to Cyclic Heat Load and Ultraviolet Impact in the Texas Environment