Crew Performance Measurement via Activity Sampling


by H. Randolph Thomas, M.ASCE, (Assoc. Prof., Dept. of Civ. Engrg., The Pennsylvania State Univ., University Park, Pa. 16802) and Jeffrey Daily, A.M.ASCE, (Project Management Trainee, Exxon Research and Engrg. Co., Florham Park, N.J.)

Journal of Construction Engineering and Management, Vol. 109, No. 3, September 1983, pp. 309-320, (doi:  http://dx.doi.org/10.1061/(ASCE)0733-9364(1983)109:3(309))

     Access full text
     Permissions for Reuse  

Document type: Journal Paper
Abstract: Three methods of measuring the performance of construction crews are described and compared. These are: (1) Work sampling, (2) group timing technique, and (3) five-minute rating. By gathering data from a time-lapse film, the three methods can be compared for the same operation. Work sampling is shown to provide important information about the characteristics of delays. Considerable time is lost because of waiting for materials and for instructions. The group timing technique provides production data that is very different from work sampling. It is suggested that this technique can be used to validate estimating data regarding cycle times. It is also shown how a crew balance index can be determined which will allow the manager to evaluate if the crew size is appropriate for the way the work is being performed. The five-minute rating is shown to be a quick estimator of the delay time of a crew. It is shown that the reliability of the five-minute rating is not as good as that of work sampling of GTT. Various parameters are calculated throughout, and it is suggested that over a period of time, these can be used to monitor crew performance.


ASCE Subject Headings:
Construction management
Productivity
Sampling
Performance characteristics