| Abstract: |
8.1 basic workplace control; 8.2 general pipe installation; 8.3 handling and operational issues; 8.4 mainline connections; 8.5 reaction or thrust blocking; 8.6 connection to structures; 8.7 installation in casings and tunnels; 8.8 other considerations; 8.9 corrosion; 8.10 measurement of pipe deformation; and 8.11 first filling of pipes. |