Utility Programs for DWOPER and DAMBRK
Time and computer resources greatly limit potential investigations and sensitivity anslyses. In order to facilitate modeling with the National Weather Service (NWS) programs DWOPER (Operational...

Optimization of Complex Hydrologic Models Using Random Search Methods
The primary objective of automated calibration of complex conceptual hydrologic simulation models is to find the global optimum of a specified response surface. While direct search techniques...

Evaluation of the Utilization of Information Systems in the Arizona D.O.T.
The design of effective information systems requires a rational analysis effort to determine specifically what functions are to be served by the system and how the system can satisfactorily...

Developmental Changes Due to Site Investigations
The Winooski Hydroelectric Company of Montpelier, Vermont is conducting the reconstruction of Dam #8 on the Winooski River in East Montpelier, Vermont. Unprecedented eminent domain proceedings...

Re-Use of Civil Structures Make Norway Hydro Possible
Utilization of abandoned civil facilities made the addition of 1,800 KW to an operating 3,200 KW hydro plant of the City of Norway, Michigan Light and Power feasible. Work consisted of...

The Consumer and the Relicensing of Hydroelectric Facilities
Investor-owned utility companies hold licenses to more than three hundred and fifty hydroelectric projects in the United States. These projects are valued at an estimated 20 billion. They...

Hydro Relicensing: Planning Environmental Support for a Major Relicensing Program
The ultimate goal of the relicensing effort is to maintain the existing FERC licenses, and projects which continue to provide economic generation capacity. Failure to plan adequately can...

Waterpower in Ontario
Ontario Hydro, a public utility, is responsible for the generation and transmission of almost all the electricity used in Ontario. In 1984 approximately 30% of Ontario's electricity...

Prospects for Hydroelectric Power Development at Corps of Engineer Dams
There are two basic approaches to developing hydroelectric power facilities at Corps dams. The Corps can develop projects at the request of Congress through the authorization process....

Economic Analysis of Low Head Hydropower Projects
A typical low head hydropower project is described and used as an example of the effect of tailwater on power generation. The discharge characteristics of upstream facilities, pool regulation...

Insuring Security Requirements of Power Contracts
Under the fixed, or levelized rate utility contract, utility offers a fixed rate for the life of the contract. In the early years, the rate is in excess of the utility's avoided...

An Overview of the Implementation of PURPA
In November of 1978, Congress enacted a major piece of legislation that started a new direction in how energy resources in this country would be developed in the next decade. The Act,...

Eminent Domain Under the Federal Power Act: Use by Private Developers to Acquire Small Sites
From the first reported case in 1922 (Alabama Power Co. v. Gulf Power Co. , 283 F. 606 (D. Ala. 1922)), through 1982 (Greenup County By and Through Ousley v. Utilities Comm'n...

Small Hydro Advocacy
The state public utilities commissions wield enormous power over the destiny of small hydro projects; power extending over rates, contract terms and dispute resolution. Yet developers...

Optimal Dispatch of Hydroelectric Systems
This paper presents a reliable and computationally efficient method for solving the optimal hydro dispatch problem. Moreover, this method guarantees a true optimal solution when the units'...

Earthquake Risks to Utah Water and Gas Systems
Designed to guide local earthquake hazard reduction programs, this study estimates direct aggregate earthquake damage to Davis and Salt Lake County utilities. For making these loss estimates,...

Seismic Risk Assessment for a Utility System
Presented is a procedure by which a utility could develop the probabilities for different levels of capital loss exposure for its system. The procedure relies on experience data obtained...

U.S. Navy's First Double Deck Pier
The present single level concept of pier construction limits the pier-side service to the fleet. With the ever increasing requirements for utilities to the ships, and maintenance and training...

Comprehensive Odor Control Programat East Bay Municipal Utility District (SD-1)
An odor control study was performed in a wastewater treatment plant in California to evaluate the interactive role of various factors tailored to site specific conditions. The scope of...

Comparison of Two Audits for Electric Utilities
Two case studies on environmental audits were examined to illustrate the differences between the comprehensive audit and a focused audit. The differences in audit team composition, technical...

 

 

 

 

Return to search