Access Granted
In southeastern Pennsylvania, CSX Transportation sought to increase the productivity of its Trenton Line freight rail service by improving the vertical clearance of its tracks so that it could operate...

West Side Extraordinary
VIA 57 West is one of the newest skyscrapers in Manhattan, New York, as well as one of its most geometrically distinct and spectacular. The geotechnical and site civil challenges of the project were equally...

Avoiding Impacts of Collapsed Mines on Railways: A Multidisciplinary Geophysical Detective Approach
The presence of abandoned mine workings can pose a significant risk to the use and development of surface structures above them, including railway lines. Typically, the adverse and often sudden effects...

State of the Practice for Laboratory Testing of Soft Soils: It's All in the Details
As with all material testing, soils testing has undergone dramatic advances in technology because of computer automation. In the 1970s, laboratories were filled with dial gages, proving rings, mercury...

A Good Cause for a Causeway: How Geotechnology and Project Delivery Restored a Roadway Embankment Crossing a Historically Challenging Soft Ground Site
As part of a Minnesota Department of Transportation (MnDOT) design-build project, a causeway was constructed in 2017 to replace an aging bridge in the southwest metropolitan area of Minneapolis. The causeway...

Hidden in Plain Sight
In Rome, the new headquarters of the BNL-BMP Paribas Group banking organization is squeezed onto a narrow stretch of land between a railway station and a set of roadways. Yet the site helped yield a stunning...

Ready, Set, Launch
The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative...

The Virginia Difference
Designed in-house by the Virginia Department of Transportation, the recently completed Route 340 South Fork Bridge, in Front Royal, replaces an existing structure that dated to the early 1940s. The longest...

Sustainability and Resilience in Transportation Infrastructure Geotechnics: Integrating Advanced Technologies for Better Asset Management
The 2030 Agenda for Sustainable Development, adopted by the United Nations General Assembly in September 2015, enumerates 17 sustainable development goals (SDGs) to be achieved by the member countries...

ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
The journal will meet the needs of the researchers and engineers to address risk, disaster and failure-related challenges due to many sources and types of uncertainty in planning, design, analysis, construction,...

ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
he ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering will serve as a medium for dissemination of research findings, best practices and concerns, and for discussion...

Offshore Technology in Civil Engineering
Hall of Fame Papers: Volume 12
This collection contains five papers of coastal engineering significance that were inducted in 2017 into the Hall of Fame at the Offshore Technology Conference....

A Preliminary Case for the Existence of Hurricane Alleys in the Gulf of Mexico
A review of hurricance intensity in the Gulf of Mexico suggests there are two alleys where hurricanes are roughly 20% more intense than elsewhere. This paper develops a physical basis for the alleys using...

When Old Meets New: Railway Geotechnics and Remote Sensing
Railroad track, like any other built structure, relies on a foundation of geomaterials for support. In its most basal form, the railway track is quite simple: steel load-bearing members (rails) supported...

Railroad Tunnel Clearance Improvement and Linear Replacement: What Happens with Unexpected Ground Conditions during Tunnel Construction?
To increase the capacity and efficiency of transporting waste by rail to an existing landfill, Enviro Solutions Inc., the landfill owner, and CSX Transportation (CSXT), the rail line owner, sought the...

Railway Geotechnical Asset Management in Great Britain: How Modern-Day Techniques Help Monitor Railway Infrastructure Dating to the 1800s
This article discusses asset management, risk management, and earthworks failures as experienced by Network Rail (NR), the owner, operator, and asset manager of the majority of the rail network of Great...

All About ISSMGE: An Interview with Leaders of the International Society for Soil Mechanics and Geotechnical Engineering
This article summarizes key discussions from an interview of a select group of International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE) leaders, conducted by a small group of students...

Restoring Steinbeck's Carmel River: The Removal of San Clemente Dam
If you've read John Steinbeck's 1945 classic "Cannery Row," then you're already familiar with the Carmel River, which he described as "…a lovely little river. It isn't very long, but in its course it has...

The Case for Tolerable Risk Guidelines to Manage Flood Risk: Nature Bats Last
Since ancient times, people have used levees to reduce flood risk. We have built over 30,000 miles of levees in the U.S., largely on the belief that levies will unconditionally protect people who live...

Connecting Faculty in Geotechnical Engineering: Thriving in a Networked World
A robust social network, defined as a group of individuals and organizations with career-related and/or personal relationships with one another, is essential for operating successfully in today's business...

 

 

 

 

Return to search