Wind Generated Wave Resuspension of Sediment in Old Tampa Bay, Florida
Vertical profiles of velocity and suspended-solids concentration were measured at a scientific instrumentation platform in Old Tampa Bay during the passage of a cold front in March 1990....

Tampa Bay: A Collaborative Approach to Effective Watershed Management
Rapid urbanization in the Tampa Bay watershed continues to challenge Florida's surface water management efforts. Upgrading of all wastewater treatment facilities substantially...

Environmental Permitting a Major Expressway Facility in Florida
As general consultant to the Tampa-Hillsborough County Expressway Authority, Howard, Needles, Tammen and Bergendoff (HNTB) was responsible for the environmental permitting required for...

Tri-County Based Travel Demand Forecasting Analyses in the Tampa Bay Area, State of Florida
This paper describes the application of the micro-computer compatible Florida Standard Urban Transportation Modeling Structure (Micro-FSUTMS) to estimate traffic volume for the purpose...

A Comparative Analysis of Microcomputer and Mainframe Computer Based Modeling Systems
This paper presents a comparative analyses of the Microcomputer Compatible Florida Standard Urban Transportation Modeling Structure (Micro-FSUTMS) performance with its UTPS mainframe computer-based...

Observation of Sediment Resuspension in Old Tampa Bay, Florida
Equipment and methodology have been developed to monitor sediment resuspension at two sites in Old Tampa Bay. Velocities are measured with electromagnetic current meters and suspended...

Pre-Treatment Process Control of a Variable Quality Raw Water Supply
The West Coast Regional Water Supply Authority is the public agency charged with the development of public water supply for the Tampa Bay Area in the state of Florida. The Authority's...

Translating Science for Coastal Decisionmaking
A uniform process of technical information assembly and application has been conducted for six major estuarine systems in Florida. Since 1976, local and regional coastal resource decisions...

Dynamic Behavior of Three J.S. Cable Stayed Bridges
Dynamic considerations in the design of three recently designed cable stayed bridges are discussed. The presentation includes analysis for eigenfrequencies and eigenmodes, assessment of...

Tampa Bay 205J Water Quality Impact Study
Tampa Bay was identified by the State of Florida Department of Environmental Regulation (FDER) as to the top priority for an impact study using federal 205(j) grant funding. The study...

Estuary-Wide Mitigation Options for Port Development in Tampa Bay, Florida
The need for a regional strategy to address the environmental problems resulting from port development in Tampa Bay was recognized as important for the improvement and protection of the...

Status of Tampa's Downtown People Mover
There are currently three People Mover Systems either in the planning stage, construction stage, or operational stage in Tampa. Tampa International Airport has had a Westinghouse Shuttle...

Tampa Does It with Mirrors
As one of the nation's fastest growing cities, Tampa needed far more public works dollars. But the traditional source, the real estate tax, can no longer be relied on so heavily,...

Monitoring of an Ocean Dredged Material Disposal Site
The Tampa Harbor Project involves deepening and widening approximately 50 miles of existing shipping channel in Tampa Bay, Florida, with the removal of approximately 70 million cubic yards...

Tampa Harbor Florida Deepening Project
Tampa Harbor is one of the largest dredging projects ever undertaken by the Corps of Engineers. The major features of the deepening project which presented the greatest problems were the...

Environmental Management Problems of Dredged Material Islands in the Tampa Bay Area
Between 1977 and 1982, four new islands were created in Hillsborough Bay as part of the Tampa Harbor Deepening Project. The islands are now 3-7 years old. They exhibit striking differences...

Tampa's Hookers Point AWT Plant Working Well
The Tampa, Florida advanced wastewater treatment plant is designed to remove a high degree of BOD suspended solids, nitrogen and phosphorous. Presently, the state has exempted the plant...

 

 

 

 

Return to search