Alternate Designs for the Sidewalls of Hydraulic Jump Stilling Basins
This paper discusses several alternate designs to replace the full height sidewalls of a type 2 U.S. Bureau of Reclamation stilling basin. The alternate designs that were investigated...

Tailwater Management with Surge Irrigation
Field data of surge irrigation has shown that, in the post-advance stage, there exists an optimum post-advance cycle time. Cycle time greater than or less than the optimum post-advance...

Economic Analysis of Low Head Hydropower Projects
A typical low head hydropower project is described and used as an example of the effect of tailwater on power generation. The discharge characteristics of upstream facilities, pool regulation...

Microcomputer-Based Index Testing of Hydroturbines
A computer-assisted system for performing index test on hydroturbines is described. This system allows for more rapid and accurate index testing of hydroturbines than has previously been...

Ditch Flow Program
Seventeenth in the CE Computing BASICS series, the program in this article is for simplifying drainage calculations. The program will provide critical and normal velocities, depths and...

Uptake of Airborne PCBs by Terrestrial Plants Near the Tailwater of a Dam

Tailwater Biota: Ecological Response to Environmental Alterations

Flow Routing in Tailwater Streams

Discussion of "Correction of Tailwater Erosion at Prairie du Sac Dam"

Discussion of "Correction of Tailwater Erosion at Prairie du Sac Dam"

Correction of Tailwater Erosion at Prairie du Sac Dam
DataNotAvailable...

 

 

 

 

Return to search