Predicting Wave Spectra With a Third Generation Spectral Wave Model
the ability of the third generation spectral wave model, 3GWAM, to simulate frequency and directional spectra during a northeast storm of October 1990 along the U.S. mid-Atlantic coast...

Numerical Modeling of Waves in Harbors
The numerical wave model HARBD has been used extensively for estimating waves in harbors. The model is used to simulate laboratory tests of long waves in a rectangular harbor with variable...

A Satellite Based River Forecast System for the Nile River
The initial version of the Nile Forecasting System developed by NOAA was used operational in July, 1993. Forecast System accuracy exceeded expectations. The Nile Forecast Center is now...

Managing Reservoir Storage for Fish Production
Salmon populations in numerous Pacific Coast rivers are in decline and are in danger of becoming threatened or endangered. A reservoir system simulation model was developed for the Trinity...

Modeling Municipal Water Demands for a Pump Station Area
The Chasewood Pump Station/Residential Area in southwest Houston was selected for a detailed analysis of ground and surface storage water pumping by a University of Houston and City of...

Optimization and Reservoir Operations for the Missouri River
As demands placed on the operation of the nation's reservoirs increase, the problem of finding the most desirable set of operation plans becomes more difficult and controversial. This...

Sustainable Management of Existing Reservoirs
Instead of a design and planning of new reservoirs in the future, more emphasis will be placed on the management of existing reservoirs. Reservoir storage reallocation and reassessment...

A Decision Support System for Administering Water Rights in an Alluvial Aquifer
A previously developed basin scale surface-ground water simulation model has been incorporated into a micro-computer based decision support system that simulates the transient ground water...

Application of the PCRSS Reservoir Simulation Model to the Salt River Project
PCRSS is a general purpose reservoir system model construction kit. It allows the user to specify the system configuration and parameters through the use of a windows based graphic user...

A Decision Support System for Multi-Purpose Reservoir Operations
A generalized decision support system (DSS) is presented for developing optimal operation policies for multi-purpose reservoirs. The model is designed for single reservoirs, although is...

A Physically Based Conceptual Model for Simulating Contaminant Levels in Subsurface Water
A conceptual physical model is developed to simulate solute transport and mixing in the vadose (unsaturated) and groundwater zones. The conceptual model couples lumped-parameters models...

Water Resource Modeling and Consensus Building
The steps undertaken to develop consensus with respect to analyzing a complex and competitive water resources/water rights situation through the development of a simulation model are described....

Simulating Hourly Hydropower Operations for the Assessment of Environmental and Economic Impact
Generation of peaking power at Glen Canyon Dam causes river flow and stage to fluctuate on an hourly basis. This has been shown to impact the downstream physical and biological environment....

Integration of Water Rights and Network Flow Modeling in the Upper Snake River Basin
The U.S. Bureau of Reclamation's Pacific Northwest Region and Denver Office are working to enhance the ability to integrate hydrological and institutional modeling capabilities for use...

PROSIM - A Water Rights-Based Operational Simulation Model of the Provo River
The development and initial application of a computer model of the hydrology, water rights, and operation of the Provo and Weber rivers in Utah are described. The new FORTRAN model PROSIM...

Predicting Hydrologic Impacts of a Severe and Sustained Drought on the Colorado River Basin
We investigated the impacts of a severe and sustained drought (SSD) on the hydrology of the Colorado River Basin. The simulation was carried out using the Colorado River Network (CORN)...

Development and Application of Long Range Study (LRS) Model for Missouri River System
The Long Range Study (LRS) Model is a simulation model developed in the 1960's develop and test criteria for operation of the Missouri River mainstem reservoirs through an extended period...

Computer Simulation Model of the Integrated Local Water Supply Plan for the City of Wichita, Kansas
The City of Wichita, Kansas will require additional water supply sources to meet projected future water demands. A study of options identified a supply plan with integrated use of local...

Development of a Wetland/Riparian Resource Model for the Missouri River System
Wetlands and riparian areas are significant resources along the Missouri River, providing important fish and wildlife habitat. These resources required evaluation as part of the review...

Missouri River Least Tern and Piping Plover Model Development
As part of the update of the Missouri River Master Water Control Manual, the U.S. Army Corps of Engineers is evaluating the effects of numerous water management alternatives on endangered...

 

 

 

 

Return to search