A Dual Answer to Seismic Stress (Available only in the Structural Engineering Special Issue)
Are two systems better than one? When it comes to high-rise seismic design post-Northridge, the answer may be yes, based on studies conducted by CBM Engineers, Inc., Houston. The aftermath...

Advances in Structural Optimization
A compilation of twenty papers, Advances in Structural Optimization features recent contributions from the United States, Japan, Canada, and...

Design of Hydraulic Steel Structures
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 22 This manual prescribes guidance for designing hydraulic...

Hazard Mitigation Issues
This chapter discusses the structural hazards that impeded rescue efforts....

Initial Hazard Assessment and Mitigation
This chapter discusses the initial assessment of structural hazards....

Discussion of Specific Hazards (Includes 16 Pages of Illustrations)
This chapter details specific structural hazards from the recovery operation....

A System Approach for Identifying and Improving Hydraulic Numerical Modeling Reliability
A system response approach which uses Fourier transform through a multiple-input/ single-output (MISO) nonlinear system to evaluate the model performance of verification and simulation...

Probabilistic Mechanics & Structural Reliability
A compilation of over 230 papers, Probabilistic Mechanics and Structural Reliability features the recent advances in probability and statistics...

Prelude to a Demolition
Building demolition conjures up images of explosives detonating or a wrecking ball haphazardly slamming into the side of a structure until it's reduced to a pile of rubble....

Restructuring
America and Beyond
This proceedings, Restructuring: America and Beyond, contains the papers presented at the American Society of Civil Engineers (ASCE) Thirteenth...

Reliability and Response Control of R/C Buildings
A damage model is summarized for the assessment of seismic damage of reinforced concrete structures. The model is to evaluate specific buildings that were damaged in Mexico City during...

Robotic Options for Mining of Near-Earth Objects
The mining and processing of a Near-Earth Object (NEO) should be as simple and as robust as possible - the fewer processes and parts the better. Reliability and survivability of the total...

Using a Small Satellite Bus As a Dedicated Platform for On-Orbit CSI Experiments
Control-Structure Integration (CSI) technology will be needed for the success of many future space missions, however, this technology will not be seriously considered for use by program...

Reliability of Structures for the Moon
The subject of risk and reliability for lunar structures is introduced and critical issues deliberated. A tensile structure is considered as an example in order to become more specific...

Distributional Information for Ejection Fragments
Due to lack of experience of building structures on the lunar surface and the variability that will exist in the loading as well as the structural resistance, it is suggested that initial...

Comprehensive Reliability Analysis of Prestressed Concrete Beams
Using second moment methods, the reliability with respect to several limit states for seventy three prestressed concrete beams is assessed. These beams that are extensively used in the...

Human Error Models for Structural Reliability
This paper presents models for human errors to be used along with reliability analyses. The models account for the occurrence of errors, their magnitude, and the detection of the errors....

Harmonization of Reliability-Based Timber Engineering Codes and Standards
An overview of activities related to harmonization of reliability-based timber design codes and standards is presented. The overview is based on information generated through a NATO Advanced...

Load and Resistance Factors for Bridge Design Code
The paper summarizes the code development procedures used for the new LRFD (load and resistance factor design) bridge code. The current specifications use allowable stresses and/or load...

Assessment and Upgrade of an Older Transmission Line
This paper discusses the various tools and procedures which have been used to assess and upgrade an older 130 kv tower line. The purpose of the assessment was to determine the line compliance...

 

 

 

 

Return to search