An Overview of Segmented Offshore/Headland Breakwater Projects Constructed by the Buffalo District
Since 1977 the Buffalo District has constructed three segmented offshore breakwater projects and currently has one under construction. In addition, the District has recently completed...

Soft Touch People Mover Central Control
The people mover central control systems perform many automatic functions, are built with off-the-shelf redundant hardware, include advanced color graphics and touch screen operator interfaces,...

Stability Evaluations for Old Water Supply Dams in Pennsylvania

Delaware Valley Regional Planning Commission's Anticipated Response to the Clean Air Act Amendments of 1990
By virtue of its charter to provide continuing, cooperative and comprehensive planning, the Delaware Valley Regional Planning Commission (DVRPC) has a commitment to adopt and maintain...

Optimal Flood Warning Threshold: A Case Study in Connellsville, Pennsylvania
A methodology for selecting an optimal flood-warning threshold has been developed by Haimes et al. (1990). The probabilistic evaluation of a forecast system coupled with a stochastic dynamic...

Delaware Estuary Nonpoint Source Control Program
Preparation of the Delaware Estuary Management Plan, sponsored by the EPA and the three states of New Jersey, Pennsylvania and Delaware, is part of the national estuaries program. As part...

Cost of Rehabilitation of Water Distribution Systems
The Chester Water Authority was established in 1868 and supplies water to residential and industrial customers in three counties in Southeastern Pennsylvania, and in addition, wholesales...

Design of Large Capacity Coal Silos for Service Life
Design and construction of Large Capacity Coal Silos for service life requires a careful consideration of the silo configuration as well as the material handling system. This paper presents...

Sustainable Energy Systems: A New Paradigm for New Energy Technologies
The fundamental links between energy production/use and the environment are becoming increasingly apparent. The major environmental challenges of global climate change, acid precipitation,...

Leachate Flow from an Experimental Fly Ash Landfill
Combustion of coal in large-scale utility boilers produces an ash by-product which is often stored in open landfills. An experimental fly ash landfill was constructed by Pennsylvania Power...

The Pittsburgh MAGLEV Project
A passenger transportation crisis exists in the United States which experts predict will only worsen, wasting billions of U.S. dollars. Magnetic Levitation (MAGLEV) is a promising new...

Beneficial Use of Coal Ash as a Structural Fill
For decades, electric utility companies have and will continue to dispose of their coal ash in various waste disposal sites. In the state of Pennsylvania, the Beneficial Use of Coal Ash...

An Electronic Specification for the Earthquake Resistance Design of the Highway Bridges in Pennsylvania
An interactive C program for the seismic design of highway bridges in the state of Pennsylvania is described in this paper. The program was developed in C language on a personal computer....

GIS in Transportation Modeling: Merging MINUTP with GIS
Transportation system modeling involves a great deal of information on features which are geographically distributed over a study area. Geographic Information Systems (GIS) are suited...

The Chesapeake Bay Critical Area Protection Program and the Baltimore Central Light Rail Line
This paper discusses Maryland's Critical Area Law, statewide guidelines and criteria, the Baltimore Central Light Rail Line, resource conservation areas, and other aspects...

Sand Bypassing at Indian River Inlet, Delaware
To solve a beach erosion problem north of Indian River Inlet, Delaware, the US Army Corps of Engineers Philadelphia District and the State of Delaware have constructed a fixed plant sand...

Initial Shoreline Response at the Presque Isle Erosion Control Project
Construction of the Presque Isle Shoreline Erosion Control Project in Lake Erie at Erie, PA began October 1989 and consists of fifty-eight offshore segmented breakwaters with beachfill....

A Case Study in Sludge Handling
When the Wyoming Valley Sanitary Authority (WVSA) converted its operation to a secondary treatment plant in 1988, something important was missing. That something was a method to handle...

Harrisburg Hydroelectric Project?Water Quality Issues
The Harrisburg Hydroelectric Project is a proposed 34.4 MW hydroelectric facility on the Susquehanna River near Harrisburg, Pennsylvania. The project will consist of a 16.5 ft high gated...

Yough Hydro Case History?Development 12 MW Facility
The Youghiogheny Hydroelectric Project (Yough Hydro Project) is licensed with the Federal Energy Regulatory Commission (FERC) as Project No. 3623. The project is a run-of-the-river facility...

 

 

 

 

Return to search