A Better Barrier
Seepage problems have troubled the Walter F. George Lock and Dam, on the Chattahoochee River, for more than 40 years. Construction of a deep positive cutoff wall is nearing completion,...

Passage to 2000
On Dec. 31, 1999 the United States turns over ownership and operations of the Panama Canal Commission. In preparation for the handover, the Panama Canal Commission, an independent U.S....

Improving the Speed of Double Lockages
The size of tug and barge combinations on the Upper Mississippi River and Illinois Waterway frequently exceed the dimensions of the lock chambers they must pass through. The locks on these...

Navigation Lock Improvements
All commercial barge traffic on the Upper Mississippi River and Illinois Waterway must pass through a system of locks designed and built in the 1930s and 40s. Many of the locks on these...

McAlpine Intake Model Study for Innovative Lock Design
The McAlpine Locks and Dam Project is located on the Ohio River near Louisville Kentucky. Construction of an additional 33.53-m-wide (110 ft) by 365.76-m-long (1200 ft) navigation lock...

Filling and Emptying System Model Study for the Innovative Lock Design
Funding constraints have generated innovative ideas regarding the hydraulic system of proposed navigation locks. Two fundamental questions addressed in the innovative lock design study...

Upper Mississippi River System Environmental Management Program (EMP)
Introduction The Upper Mississippi River Navigation System (UMRNS) is one of the largest Public Works projects existing within the continental United States of America. The system, which...

Locking Into Success
In 1961, at Wheeler Lock in Alabama, crews with the Tennessee Valley Authority tried to incorporate an existing lock wall into a new cofferdam. A major portion of the land wall slid about...

Management of Sediments on the Red River Waterway Project
The Red River is a large alluvial river system with the lower 280 miles currently being developed for shallow draft navigation. The navigation project entails construction of five locks...

The New Clark Bridge: Saddle-Draped Cables
The new $85 million, 108 ft wide Clark-Bridge replaces a 20 ft wide 1928 truss bridge at Alton, Ill., carrying US 67 over the Mississippi about one mile above the recently completed Lock...

DSM Saves the Dam
The Miami Conservancy District built five flood control dams after the catastrophic flood of 1913 in Dayton, Ohio. Lockington Dam was one of these five hydraulic fill structures. The Ohio...

Simulation of 3D Free Surface Flows in Hydraulic Structure with Submerged Flow Passages
This paper presents primarily the results of an application of the newly refined computational simulation model to study three-dimensional flows in a lock and dam system, which has submerged...

The River Ice Management (RIM) Program: Developing New Options for Waterways Operations in Winter
Most of the navigable inland waterways of the United States are utilized year-round. In northern portions of this network (mainly parts of the Ohio and Upper Mississippi River basins),...

Computerized Hydraulic Modeling?A Case Study
A hydraulic model study is being conducted at the Alden Research Laboratory, Inc. (ARL), to study the effects of adding a hydroelectric generating station at the site of an existing lock...

Partnering on the Bonneville Navigation Lock
The Portland District of the Corps of Engineers has found partnering to be a valuable technique for contract and project management. This paper presents details of the execution of the...

The Design & Construction of Marina Martinique, S. Africa
Marina Martinique is a coastal residential marina in the eastern Cape Province of South Africa which will ultimately accommodate 730 moorings and 1100 low rise residential units, most...

Reliability of Miter Gates
A new approach for the reliability calculation of miter gates is presented. The reliability and hazard functions are related to the surficial wear of miter gates on their horizontal sill....

Sediment Management Challenges of the Red River Waterway Project
The Red River Waterway project consists of channel stabilization and construction of navigation locks and dams to provide a 9 foot minimum depth for a distance of approximately 236 miles,...

Montgomery Point Lock and Dam Entrance to the McClellan-Kerr Arkansas River Navigation System
The McClellan-Kerr Arkansas River Navigation System has experienced a steady and positive increase in use. However, in the last 10 years changing conditions along the Mississippi River...

Modification to John H. Overton Lock and Dam
The Red River Waterway Project, Mississippi River to Shreveport, Louisiana, will consist of a navigation channel 9 feet (2.7m) deep by 200 feet (61.0m) wide, 5 locks and dams providing...

 

 

 

 