City and County of Denver Approach to Management Requirements
Construction of large infrastructure projects has become increasingly rare since the 1960's. In fact, America has not built a new airport since 1974. While sparse funding is certainly...

Management of Design
Denver's new airport uses the services of over 80 separate design firms. The existing airport, Stapleton, could not be expanded to meet the forecasted demand of 1,200,000 operations with...

Construction Approach to Denver International Airport
The new Denver International Airport, a $2.7 billion project, is being designed and constructed under the oversight and guidance of a Program Management Team (PMT) led by the City and...

Denver International Airport Fabric Roof Design
The design of Denver's Landside Terminal Complex for the new Denver International Airport, called for some far reaching vision coupled with imaginative building technologies. Because of...

The Design of the Airside Concourses
The growth of commercial air traffic in the United States has resulted in the development of the 'New Denver International Airport.' the airside concourses were designed by joint venture...

Baggage System Implementation at DIA
BAE Automated Systems is currently under contract to supply the complete, Integrated Automated Baggage Handling System (IABHS) for the New Denver International Airport. The system represents...

Impact of the New Denver Airport on the Air Traffic Control System
Building the new Denver Airport has two major impacts on air traffic control: first, it requires redesigning the airspace surrounding the Denver area; and second, it requires moving to...

The Airport Traffic Control Tower for the New Denver International Airport
Developing a new airport traffic control tower involves many complexities of planning, engineering, and coordination. For the ATCT at the New Denver International Airport, these complexities...

Decision Support for Colorado River Operations
The United States Bureau of Reclamation (Reclamation) uses a simulation model known as the 24-month Study Model for planning monthly and seasonal operations for the Colorado River Basin....

Project Controls for Denver International Airport
Managing a $2 billion dollar construction program requires a unique application of tried and true control systems and provides an opportunity to innovate new methods. The Program utilizes...

Pavement Design for the New Denver International Airport
Denver International Airport is the first new major U.S. airport in twenty years. Primary airfield elements in Phase I development include 5-12,000 foot runways and 1-16,000 foot runway,...

Estimating Toll Diversion for Beltways
The proposed E-470 beltway is a 48-mile circumferential highway which will connect major public and private developments east of the Denver metropolitan area as well as the new Denver...

Implementing the E-470 Beltway
The paper addresses various elements of implementing the 50 mile eastern half of the beltway around the Denver metro area. This paper addresses many unique characteristics associated with...

Shop Creek Stormwater Quality Enhancement Project
The advent of NPDES regulations for stormwater discharges creates a need to verify, on a regional basis, the effectiveness of emerging water-quality control technologies such as extended...

Design and Construction of Soil-Cement Drop Structures
Soil-cement has been used as an effective and economical slope protection material for embankment dams and stream banks. This paper describes the use of soil-cement in the construction...

Hydraulic Modeling of Boating Hazards and Sedimentation?Union Avenue Dam, Denver Colorado
Hydraulic jump type energy dissipators are a hazard to recreational boaters. Many white water boaters have been trapped in 'reverse roller' hydraulic jumps. Numerous...

Hydrologically Optimizing Stormwater Quality Facilities
There exists a need to develop a method for the sizing of urban stormwater runoff capture volume for water quality enhancement purposes. This paper describes a method that utilizes hydrologic...

PROFS Role in Modernization of the National Weather Service
This paper describes the overall modernization procedure and the computing infrastructure that will support hydrologic operations in a prototype workstation that will be available in National...

Sediment Flushing Experiences at Cherry Creek Dam
An overview of the U.S. Army Corps of Engineers, Omaha District's experiences in sediment flushing operations at Cherry Creek Reservoir near Denver, Colorado is presented....

Water-Quality Ponds ? Are They the Answer?
Water-quality 'wet' ponds have been proposed to treat storm water for the removal of phosphorous in streams tributary to Cherry Creek Reservoir, a major recreational...

 

 

 

 