The Many Faces of RCC
The Chinese government, under an aggressive move to boost its hydroelectric power output, is building an extensive system of dams nationwide. Chinese engineers have developed innovative...

Optimization of the Operation Rules of Multipurpose Multireservoir Systems; New Approach
In recent years Iran is ranked 4th among countries having the highest number of dams under construction on her hydrosystems. This has called for...

Dam within a Dam
A routine inspection of the Rock Run Dam, an 84-year-old Ambursen-type structure in Chester County, Pennsylvania, revealed major stress cracks and water stains on the inside face of the...

Three Dams, One Reservoir
The three dams that make up the 800,000 acre-ft (987 million m�) Eastside Reservoir in Riverside County, California, required extensive foundation excavation and careful placement of embankment...

Moving Mountains
The earthmoving and rock-crushing operations at the Eastside Reservoir represented one of the largest such projects in the history of the United States. The earth and rock-fill dams required...

Inside Job
River Mill Dam is a large Ambursen (buttress type) dam constructed in 1911 on the Clackamas River in Oregon. The preliminary and final design phase of the seismic upgrade project coincided...

Added Protection
The U.S. Bureau of Reclamation is modifying the 335 ft (102 m) high Casitas Dam in Ventura County, California, to withstand a magnitude 6.9 earthquake. The modification includes strengthening...

Testing the Load (Available in Geoenvironmental Engineering Special Issue only)
The Pittsburgh District of the U.S. Army Corps of Engineers recently began construction of a new gated dam to replace a nearly 100-year-old concrete fixed-crest dam on the Monongahela...

Historical Sediment Budget Analysis of the Malibu Coastline
Sediment supply to the Malibu coastline has been continually decreasing since development began in the Santa Monica Mountains in the 1880's due to dam construction for irrigation and recreation,...

Coastal Benefits and Impacts of Dismantling Matilija Dam
A numerical shoreline evolution model was used to examine the shoreline changes associated with the release of 2.3 million cubic meters of beach quality sediment from behind Matilija Dam....

Damn Sand Rights: Removing Rindge and Matilija Dams
Two dams built in the 1920's and 1940's within southern California coastal drainages have reached the end of their useful lives, and their decommissioning and removal is being actively...

Safeguarding Los Alamos
A forest fire that burned 48,000 ac (19,500 ha) around the Los Alamos National Laboratory, in New Mexico, in May 2000, created another problem for one of the nation's most...

Guidelines for Instrumentation and Measurements for Monitoring Dam Performance
Prepared by the Task Committee on Instrumentation and Monitoring Dam Performance of the Hydropower Committee of the Energy Division of ASCE. This report...

Dam Breaching: The Rest of the Story
The U.S. Army Corps of Engineers is evaluating the possibility of breaching four dams on the lower Snake River to improve salmon migration. Because significant infrastructure modifications...

Stepwise Flood Routing for Gated Reservoirs and Conjunctive Optimization of Hydroelectricity Income with Flood Losses
A six-stage operation policy for routing of flood hydrographs of return periods from 1.01 year up to the Probable Maximum Flood (PMF) for dams having gated spillways is suggested. The...

Traditional Engineering Takes a Turn for the Future Decommissioning Dams and Restoring Ecological Integrity
(No paper) This paper will address the emerging shift evaluating the true value of dams and the importance of including the costs of the initial construction and investments required for...

Instrumentation of Embankment Dams and Levees
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 26. Whether analyzing data to determine the competency...

For the Duration
The U.S. Army Corps of Engineers developed a new grouting method called duration grouting when constructing the foundations for the Portugues Dam in Ponce, Puerto Rico. The site is marked...

Construction Control for Earth and Rockfill Dams
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 27 This manual provides critical guidance for constructors...

Over the Top Concrete
The 60-year-old Tongue River Dam in southeastern Montana is undergoing extensive dam safety and reservoir enlargement modifications. Major features of the project include a 60,000 cfs...

 

 

 

 