Chesapeake Bay Field Modeling and Monitoring Projects
'Traditional' erosion control measures often do not meet the Corps of Engineers' requirement for economic justification. The costs of these measures...

Composting, Past, Present and Future
Over the past ten years, the composting process has taken on a different look as a method of processing municipal sludge. Today it is one of the most popular and prevalent methods of sludge...

Crossflow vs. Counterflow Air Stripping Costs
Crossflow towers offer a potential economic advantage over counterflow towers due to savings in fan power costs as well as material costs. These savings increase as contaminant volatility...

Environmental Protection, Resource Allocation and CERCLA: A Practitioners Perspective
In accepting Superfund's mandate of protection of human health and the environment in a timely manner, critics often overlook, the limited human, technical and material resources...

Probabilistic Analysis of Modernization Options
Benefit-cost analysis is a standard procedure for reaching planning decisions. Cost overruns and benefit shortfalls are also common occurrences. One reason for the difficulty of predicting...

Evaluating the Dynamic Operating Benefits of Hydro Power Plants
In 1986, the Electric Power Research Institute asked Decision Focus to develop a new planning model to quantify the dynamic operating benefits of power technologies that offer operating...

When FERC Investigates Your Unlicensed Project: A Five-Point Protection Plan
A FERC investigation into a project's jurisdictional status poses the potential for substantial risks and costs. This paper outlines a 'five-point protection...

Hydropower: Making Its Mark in North America
To discover what plans North American hydropower producers have for their hydroelectric resources in the 1990s, Hydro Review conducted a survey of leaders in the hydro generation industry...

EPRI's Pumped Storage Planning and Evaluation Guide
EPRI's Pumped Storage Planning and Evaluation Guide was published in 1990. The Guide provides step-by-step procedures to: (a) evaluate pumped-storage operation in a utility...

Small and Low Head Pumped Storage Projects
With the recent completion of several very large pumped storage projects, the perception of a hydroelectric pumped storage project in some power industry circles may be that of a project...

Small Hydro Site Ranking, Cost Methodology and Program
The user-friendly micro-computer program SHYDRO for costing small hydro has been prepared for the government of Canada and is available in the public domain. SHYDRO was initially applied...

Evaluating Hydro Project Benefits with the POWRSYM Production Cost Model
The contribution that a hydro peaking project or pumped-storage project makes to reducing system operating costs can be determined only by modeling the project's operation...

Dewatering Using a Floating Bulkhead Proves Flexible, Reusable and Cost Effective
Going beyond a traditional bulkhead dropped in place with a barge crane or crane hoist, a steel floating bulkhead was conceived to dewater powerplant intakes, gated spillway bays or outlet...

Probabilistic Scheduling of Cavitation Repairs
The probabilistic nature of maintenance scheduling is exemplified by operating histories and conditions which vary from unit to unit. Typically, an operator must decide whether to repair...

Hydro Plant Modernization and Uprating
The paper suggests that the method to achieve desirable hydropower benefits at costs lower than for new thermal projects, is through systematic modernization and upgrading of older hydro...

Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...

Direct Load Cell-Based Weighing Lysimeter System
A low-cost weighing lysimeter system is described which is capable of measuring evapotranspiration with an accuracy of 0.05-0.10 mm. A two-lysimeter system with electronic data logger...

Adopted Drip Irrigation Technology for Developing Countries
Two low cost drip irrigation systems are presented. Even though the uniformity of these systems is not as high as the conventional drip systems, the initial and operating costs of the...

Planning and Organization to Control Liabilities and Insurance Cost
The liabilities and insurance cost associated with construction projects can be considerable. Activities that are performed which carry extensive liability exposures with limited controls...

Who Pays for the Unexpected in Construction? A Heavy Construction Contractor's Viewpoint
The complex question of who pays for the unexpected in construction is analyzed using several examples from experience. In addition to the unexpected being due to subsurface conditions,...

 

 

 

 

Return to search