Application of Numerical Models in the Design of Clarifiers
In this study, a numerical model of a circular clarifier was applied to reveal the effects of the water depth on the hydraulic and removal efficiency. The velocity and solids concentration...

Clarifier Enhancements Yield Excellent Performance
The critical role of final clarifiers in meeting effluent permit requirements in indisputable. Poor performance of the final clarification step may adversely affect effluent quality. Experience...

Optimizing Secondary Clarifier Performance: A Presentation Outline
Optimizing secondary clarifier performance is an activity that involves a consideration of the design, the maintenance, and the operation of the clarifier. Although the basic shape of...

Evaluating Activated Sludge Secondary Clarifier Performance: A Protocol
To establish a consistent methodology for evaluating secondary clarifier performance, the ASCE Clarifier Research Technical Committee prepared procedural guidelines in the form of a draft...

Sludge Hopper Design for Activated Sludge Clarifiers
Only in the past few years has any attention been allocated to the transport characteristics of sludge collectors. However, no attention has been given to a design rationale for the sludge...

Application of the ASPEN System for Simulation of the Detroit Waste Water Treatment Plant
The objective of this study is to simulate the Detroit Wastewater Treatment Plant (DWWTP) using the Advanced System for Process Engineering (ASPEN). The primary treatment facility has...

Rehab Defies Pros, Beats Clock
Fast-tracking an overhaul of its wastewater treatment system let Columbus, Ohio escape federal penalties under the Clean Water Act. Over $200 million was invested to improve the city's...

New Clarifiers Help Save History
By using clarifiers to upgrade a waste treatment plant, Camp Dresser & McKee were able to utilize the available space so that an historic building existing within the plant could...

Understanding Secondary Clarifier Behavior
The author has developed a graphic procedure for analyzing the hydraulic behavior of settling tanks. Data have been used in numerous cases to devise low cost in-tank and external improvements...

New Wastewater Process Cuts Plant Costs 60%
By combining the aerator and the clarifier into one basin, this new wastewater treatment process can slash capital costs up to 60% and operating and maintenance costs up to 45%. Raw sewage...

Honolulu Sewage Plant Pioneers Advanced Primary Treatment, Has Deepest Ocean Outfall
Honolulu recently started up a new sewage treatment plant that brings a new twist to decades-old sewage-treatment technology: advanced primary treatment. Key to this primary treatment...

 

 

 

 

Return to search