Progress Since 1979 in Canada
The report that follows describes the Canadian progress in urban hydrology research and in applications of research findings during the period from 1979 to 1983. The main topics include...

Geological Environmental and Soil Properties
Proceedings of the Geological Environment and Soil Properties Convention held in Houston, Texas, October 17-21, 1983. Sponsored by the ASCE Geotechnical Engineering Division. Geological...

The Northern Community
A Search for a Quality Environment
Fifty-eight of the papers prepared by individuals attending the 1981 Specialty Conference on the Northern Community are presented. The papers are organized into seven main subjects related...

Recent Development in Geotechnical Engineering for Hydro Projects
Eleven of the papers presented at three sessions of the ASCE Geotechnical Engineering Division at the 1981 International Convention are included. The papers are divided into two subjects:...

Expansive Soils
Fifty-two papers presented at the Fourth International Conference on Expansive Soils are included; conference panel and open discussions are summarized. Engineers often predict anticipated...

Irrigation and Drainage
Today's Challenges
Thirty-nine papers presented at the 1980 specialty conference of the ASCE Irrigation and Drainage Division are included. The papers are divided into 12 major topics: 1) Challenge of maintaining...

Ontario Writes New Bridge Code
In 1976, Ontario's Ministry of Transportation and Communications decided to write its own bridge design code, breaking away from the AASHTO code, because: (1)It wanted a metric...

Ports '77
Proceedings of the 4th Annual Symposium on the Waterway, Port, Coastal and Ocean Division of ASCE, held in Long Beach, California, March 9-11, 1977. Sponsored by ASCE, Los Angeles Section;...

Automatic Surveying � Updating Canada's Control
With Litton's Auto-Surveyor system you can perform third-order surveys driving at highway speeds or flying in a helicopter. With proper planning...

Job-Site Innovations Slash Time, Cost of Constructing Canada's Tallest Skyscraper
In Building Canada's tallest office building, the 72-story First Bank Tower in Toronto, owner-developer Olympia & York introduced several job site innovations that...

Experts Critique the Olympic Structures of Montreal
At a panel discussion held recently in Montreal, a number of prominent architects and engineers critiqued the Montreal Olympic structures. Unlike some previous press reports, the blame...

Design and Construction of Steel Chimney Liners
This is believed to be the first book to be compiled and published on this subject, even though the steel liner is now the most widely used in fossil-fueled electric generating stations...

 

 

 

 

Return to search