Bid Relief Possible, Sometimes
No List of Subs, No Bid
Alternate Bid Picks Hybrid Bridge
No Signature, No Bid
A CM Multiple Contracting Cost Model
The original purpose for construction management was cost savings through time savings and efficient operations. As the CM system expanded in use and scope of services other very significant...
Failure to Contest Bid as Taxpayer
Highway Bids Top $6 Billion
Bid Error Low Price Honored
Design Flexibility Cuts Costs
The Los Angeles Water Department saved $5 million on a pipeline project by investigating the capabilities of pipe fabricators to furnish the pipe size required and by being open to alternate...
Words Prevail Over Numbers in Bid Error
The Resident Engineer?Contractor Relationship
This paper focuses on one type of contract and the relationship between the Contractor and the Resident Engineer that exists within that contract. The type of contract is where the Owner...
Constructibility Review of Documents Before Bidding
Many claims have their inception at the very beginning of a project, specifically at the time of bidding. Contractors review the Contract Documents prior to bidding. The way in which they...
Bid Variance Is Unfair Advantage
Bid Rigging
Bid Rigging
Bid with Math Error Cannot Be Withdrawn After Opening
City Violated Its Bidding Rules�All Bidders Did Not Compete Equally
Survey of Competitive Bidding in Maryland
Is There a Bid for Services in Your Future?
Selection of architect/engineer firms based on price in addition to qualifications is apparently here to stay. Those in favor of competitive negotiation say that it prevents corruption,...
Earthwork Bid Estimating and Equipment Selection System2 (EBEES2)
Return to search