Maclay Highline Makeover
Looking to accommodate excess flows from the Los Angeles Aqueduct, the Los Angeles Department of Water and Power turned to the Maclay Highline, a dormant system once used to convey water from the aqueduct...

Seismic Performance of the Second Los Angeles Aqueduct at Terminal Hill

PCCP Repair with Steel Liner and Polyurethane

Pipe Up
The East Bay Municipal Utility District (EBMUD) provides potable water for approximately 1.2 million people in San Francisco's East Bay area and is constructing seismic upgrades...

Alternative Water Supplies Reduce Threat to Lake Chapala

Seismically Upgrading the Mokelumne Aqueducts

Seismic Design of Puerto Rico's North Coast Superaqueduct

Case Study: Crossing of Existing PCCP Aqueducts A and B, Southern Nevada Water Authority Las Vegas, Nevada

Internal Inspection and Database Development of PCCP

Making Way for Water
The State Water Project Coastal Branch Aqueduct and Extensions brings 48,000 acre feet of water annually to 23 Southern California communities. built over five years, the project involved...

Optimal Automatic On-Demand Canal Control System Design

Stone Arch Aqueducts of the C&O Canal

Inspection and Evaluation of a 100-Year Old Aqueduct Tunnel

Leakage Evaluation of a Buried Aqueduct

Seismic Risk Analysis of Hultmann Aqueduct

Structural Evaluation of Hultman Aqueduct

Managing Water Scarcity Through Man-Made Rivers

Montgomery C. Meigs: The Eclectic Engineer

California Aqueduct Modeling Package (CAMP)

First Steps in Aqueduct Leak Risk Assessment

 

 

 

 

Return to search